An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POWER SYSTEMS Carbon Capture Systems by Alstom – Clean Power Solutions Jean-Michel Aubertin San Francisco, Aug 5th, 2008

  2. CO2 Capture Solutions Power Plant with CO2 capture SOLUTIONS DEVELOPED BY ALSTOM Oxy - combustion Pre - combustion Post - combustion (New + retrofit ) (New only) (New+retrofit) Source: Vattenfall Source: Vattenfall Source: Vattenfall Source: Vattenfall CCS solutions must adapt on installed base Carbon Capture Systems by Alstom - 17/11/2014 - P 2

  3. Main partnerships & Projects 0.25 MWt Stanford (US) - Gas and Coal 5 MWt Pleasant Prairie (US) - Coal 30 MWt Mountaineer (US) - Coal CHILLED >200 MWe Northeastern (US) - Coal AMMONIA Transalta (Canada) - Coal 200 MWe 5 MWt Karlshamn ( Sweden ) - Gas Mongstad ( Norway ) - Gas 40 MWt ADVANCED Joint Development Partnership 30 Mwt In Negotiations AMINES >150 Mwe 30 MWt Schwarze Pumpe (Germany) - Coal OXY - COMB 250 MWe Jänschwalde Feasibility Study Carbon Capture Systems by Alstom - 17/11/2014 - P 3

  4. Chilled AmmoniaDevelopment Roadmap 2015 2009 Aug 06 2008 Jul 06 SGR FGR IGR CGR DGR 1 SRI Small Bench Start detailed engineering June 08 June 06 Nov 06 Test Plant Start-up Large Bench Scale (SRI) 2 Tests completed Jan 07 Jul 06 March 09 June 08 WE Energies Validation PilotCoal - (15,000 TPY) 3 Oct 07 4 AEP Mountaineer - COAL (100,000 TPY) May 07 July 07 E.ON Validation Pilot OIL/GAS (15,000 TPY) 3 Nov 07 4 StatoilHydro Mongstad -GAS (80,000 TPY) Transalta (1 500 000 TPY) 2015 AEP Northeastern (1 500 000 TPY) Carbon Capture Systems by Alstom - 17/11/2014 - P 4

  5. Chilled Ammonia field pilot at We Energies • Designed to capture up to 15,000 tons/year of CO2 • Testing to continue through 2008 • Key Objectives: • Proof of Concept • Conduct long-term tests to establish process integrity • Measure energy consumption • Develop techno-economic analysis to scale the system for commercial applications We Energies Pleasant Prairie Power Plant (P4) Carbon Capture Systems by Alstom - 17/11/2014 - P 5

  6. Field Pilot at We Energies Carbon Capture Systems by Alstom - 17/11/2014 - P 6

  7. Absorption Carbon Capture Systems by Alstom - 17/11/2014 - P 7

  8. Advanced AminesDevelopment Roadmap Sep 07 Nov 07 June 08 2009 2015 FGR CGR SGR DGR IGR Test Plant Start-up Technology Licensing 1 Tests completed Sept 07 July 08 Pilot test at UT 2 100,000 TPY VALIDATION 3 Commercial Scale Unit > 150 MW Carbon Capture Systems by Alstom - 17/11/2014 - P 8

  9. Amine Based Processes • Amine CO2 capture is proven • Retrofitable • Installed on a few plants burning coal • High energy demand for regeneration Exclusive partnership with DOW • Advanced Amines • Improved Process • Plant Integration PP Esbjerg Denmark 1 t CO2/h pilot plant (CASTOR EU-FP6) Warrior Run, Maryland AES CFB w/MEA CO2 separation SHADY POINT, OKLAHOMA, USA AES CFB w/ MEA CO2 separation Carbon Capture Systems by Alstom - 17/11/2014 - P 9

  10. One Megawatt Pilot Facility – at University of Texas Carbon Capture Systems by Alstom - 17/11/2014 - P 10

  11. Oxy-CombustionOxy-PC: Demonstration 30 MWth: Vattenfall • Demonstration/Validation program • Goal: validation and improvement • of oxyfuel process starting 2008 Main features • 5,2 t/h solid fuel • 10t/h oxygen • 40 t/h steam • 9 t/h CO2 • ALSTOM supplies the oxy-boiler and ESP Source: Vattenfall Carbon Capture Systems by Alstom - 17/11/2014 - P 11

  12. Vattenfall 30 MWth Oxy-fuel Carbon Capture Systems by Alstom - 17/11/2014 - P 12

  13. Vattenfall 30 MWth Oxy-fuel Carbon Capture Systems by Alstom - 17/11/2014 - P 13

  14. OxDP Study 250 MWe Jänschwalde – Oxy-fuel O2 purity 95% / 99.5% CO2 Capture Rate >90% CO2 Product Purity >95% Fuel Lignite (12% Water) Steam Mass Flow 815 t/h SH/RH Temperature 535/540°C SH/RH Pressure 165/40 bar Load Range (w/o Support) 60-100% DeNOx SCR - Feasibilty study, started 1st of May 08, funded by Vattenfall Carbon Capture Systems by Alstom - 17/11/2014 - P 14

  15. Oxy-combustion: oxyfired CFB Several projects at 30-75 MWth scale in preparation Carbon Capture Systems by Alstom - 17/11/2014 - P 15

  16. www.alstom.com