An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kansas City BRT Metro Area Express (MAX) TRB BRT Conference, July 21, 2008

  2. Metropolitan Kansas City • Bi-State (Kansas/Missouri) • 1.8 Million Population • Kansas City Area Transportation Authority (KCATA): • Prior to BRT: All Bus Transit System • <50,000 Average Weekday Trips

  3. Southtown Corridor River Market Downtown Crown Center MidTown /Main St Country Club Plaza • Regional Employment Center • Civic And Cultural Amenities • Commercial and Retail • Diverse Communities • Slow Transit Service • Declining Transit Ridership • 2004 Average 3,200 Daily Trips

  4. Light Rail Planning 1970’s to 2000 • Multiple AA and MIS Studies 1970’s thru 1990’s • Starter Line Prelim. Engineering 1995 to 1997 -$250M • Central Business Corridor LRT 1999 to 2001 • Failed Sales Tax Vote for LRT August 2001 - $793M • No local business or political support • BRT if LTR not possible • Satisfied Federal AA Requirement for BRT

  5. After years of rail planning Bus Rapid Transit BRT is not rail, BUT IT CAN: • Operate like rail • Provide rapid transit link between Downtown, Crown Center, and Plaza • Be Built and Operate: • At a fraction of the cost of rail • With 80% Federal Funding • NO New Local Taxes ! • In less than 5 years (Actually 3 years) • Gain business and political support !

  6. BRT Development Timeframe • Planning 2002 • Formal Partnerships • City and Parks Dept. 2003 • Main St. Community2003 – Present • Design/Engineering 2003/2004 • Vehicles Ordered 2004 • Construction 2004-2005 • Operational July 2005

  7. Profile of KCATA BRT • Arterial Street Running BRT (6 Miles) • Simple but Substantial Stations w/Enhanced Amenities • Real-Time Information – All Stations • Exclusive Transit Lanes • Signal Priority – 31 Intersections • Identity / Branding – MAX • 9 Minute Peak Hour Headways • Travel Time Reduced by 20%+

  8. MAX Vehicles / BRT Specific

  9. Vehicle Objectives • Distinctive BRT Design • Identifiable as BRT from Shape & Graphics • Identifiable as BRT Day and Night • Stylish / High Tech. Look • Incorporate New Technology • Affordable • Maintainable without major facility changes • 2004 Unit Price: $323,000

  10. MAX Vehicles • Fleet of 13 Vehicles • 42’ Low Floor Vehicle • BRT Style • Unique MAX Paint Scheme • Wider Doors & Windows • Improve Knee-Hip Room • 39 Seats • GPS, MDT, TSP • Bike Racks

  11. MAX Street Operations • 7 days a week • 4:30 am to midnight • 9-minute headways am & pm peak • 15 minutes midday, Saturday, events • 30 minutes nights and Sundays • Plaza to Downtown: 18 minutes • Previously 24 minutes • Local bus service paired with MAX in corridor

  12. MAX ‘Bus Only’ Lanes • Street Capacity Available • Peak Hour ‘Bus Only’ Lanes • Full-Time ‘Bus Only’ Lane Downtown • ‘Bus Only’ Lanes 52% of MAX • Meets FTA “Fixed Guideway” Requirement (for New Starts)

  13. ITS Technology ATA MDT & IVLU control and activate on-board emitter • Radio/GPS System (Separately funded) • Traffic Signal Priority (TSP) • Upgraded controllers and interconnect (fiber) • New BRT signal timings • TSP When >1 min. late • No Operator Interaction • Goal: 60% to 70% TSP granted

  14. Station Design

  15. MAX Station Design Goals • Reposition Transit Image • Clean, Sleek and Modern • Sense of Permanence • Integrate New Technology • Branding/BRT Identity • Standard Elements (Site adapted kit of parts) • Station Prototype

  16. MAX Station and Amenities Landscaping/Public Art at selected locations where ROW available MAX Shelter Trash Receptacle MAX Marker Sidewalk/Streetscape Improvements • Named Stations for Community / Neighborhoods • Attractive, Well-Lighted Station, Unique to MAX • Pedestrian / Sidewalk / Streetscape Improvements • Real-Time Bus Arrival Signage and Announcements

  17. MAX Station Shelter and Marker

  18. MAX Station Shelter and Marker

  19. ITS Technology • Real-Time Arrival Information • All Stations • Traffic Signal Priority • 31 Intersections • Automated Announcements • Audio and Visual (Sign) • On-board and external

  20. Station InformationNeighborhood and Transit

  21. MAX Capital Cost • Capital Cost - $21-Million • 80% Federal Funding • 20% Local Funding • Budget Breakdown (In Millions) • $ 2.9 Planning, Design & Engineering • $ 4.3 Vehicles and Inspections • $ 2.3 Street Paving Construction • $ 1.8 Traffic Signal and Signal Priority • $ 8.5 Stop Construction / Installation • $ 0.7 Admin, Easements, Utility & Legal

  22. MAX Bus Rapid Transit • MAX Opened July 2005 • Ridership Up 50%+ • Pre-MAX: 3,200/day • Current: > 6,000/day • High Level of Public Acceptance and Satisfaction

  23. Keys to MAX Success • Early Cooperative Partnerships • City, Community, MainCor • Formal ATA / City Agreement • Early Prototype Station • Avoiding ROW Acquisition • Stations on Far Side of Intersections • Funded with Existing Resources • MAX Branding and Marketing

  24. What would we do differently? • More Buses – Small Fleet Challenges • Fewer Station Compromises • More emphasis on far side stations • More Lane Dedication (More Hours) • No added stations / Maintain spacing • Signal Priority • Negotiate more transit priority • Add intersections • Expanded sidewalk improvements • More emphasis on ride quality and pavement improvements

  25. Expanding MAX FTA Small Starts Program Liberty / KCI. KCI Downtown. North Oak State Ave. Independence Ave. Shawnee Mission Pkway Linwood /Highway 40 Troost Metcalf / College. Main/Wornall - MAX

  26. Troost Corridor Existing Route # 25 Troost Local Bus Service • Local Transit Service Only • 13+ Miles • Daily Transit Ridership 7,500+ • Frequent, Closely Spaced Stops • Very Slow Service in Urban Core

  27. Troost BRT Implementation Schedule • 2006 – Planning / Update AA • Sept. 2006 – Small Starts Funding Submission to FTA • Summer 2007 – Complete PE & Project Development • 2008 / 2009 – Final Design / Construction • Open – Late 2009 / Early 2010

  28. Troost BRT – Very Small Start • Corridor Based Project (10 Miles – Urban Arterial) • Existing Ridership ~ 7,500 • To > 9000 (20% Increase) • Emphasize MAX Brand • < 10 Min. Peak Headways • 20%+ Time Savings

  29. Troost BRT – Very Small Start • Substantial Branded Stations • 44 Stations (2 per Intersection) • 2 Park and Rides + Terminus • Signal Priority @ 34 Intersections • Low Floor BRT Vehicles (14) • Capital Cost < $3 M per Mile

  30. Troost MAX Station Design • Unique to Troost MAX • Recognizable as MAX Brand • Community Input on Station Naming • More Amenities & Waiting Areas • Multi-Directional Weather Protection • More Lighting & Pedestrian Improvements • Incorporate “Green Elements”

  31. Troost MAX Station Design

  32. Branding MAX on Troost • Maintain MAX • Route Name • Colors • Vehicle Displays • Information Displays

  33. MAX Vehicles-Uniform Fleet with Colored Headsigns- Introduction of Hybrids

  34. Troost MAX Capital Cost • Capital Cost - $30.7-Million • 80% Federal Funding – VERY SMALL START • 20% Local Funding • Budget Breakdown (In Millions) • $ 3.2 Planning, Design & Engineering • $ 5.9 BRT Vehicles (Includes 3 Hybrids) • $ 0.4 Support Facilities (Maintenance) • $ 3.5 Paving, Streetscape, Sidewalk • $ 2.5 Systems (Signals, Signs, TVM) • $12.6 Stations & Park-and-Rides • $ 1.3 Admin, Easements, Utility & Legal

  35. QUESTIONS?