Construction Activities: Continuing BFP installation and Irrigation wirings

Engineering & Construction Management Department. August Report, 2012. Project: Jorge Montalvo Park Irrigation.

van
Download Presentation

Construction Activities: Continuing BFP installation and Irrigation wirings

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department August Report, 2012 Project: Jorge Montalvo Park Irrigation General Project Description: Project improvements at 6500 Tiger Eye Drive consist of providing all labor, equipment, material and incidentals to install irrigation system and grass sodding to Jorge Montalvo Park approximately 3.27 acres. Construction Activities: • Continuing BFP installation • and Irrigation wirings • Picture 1 is pump House • Picture 2 is electrical power pole and electrical meter box. Photo Picture 1 Photo Picture 2 Project Schedule Page 1 of 2

  2. Engineering & Construction Management Department October Report, 2010 Project General Project Description: Project improvements at 6500 Tiger Eye Drive consist of providing all labor, equipment, material and incidentals to install irrigation system and grass sodding to Jorge Montalvo Park approximately 3.27 acres. • Project Budget: (includes approved project development, design and construction costs) • $ 282,467.50 • Notes: The irrigation lines and wirings ongoing installation. • Water meter installed by EPWU. • Electrical service connection due this week 8-8-12. • Project is about 65% completed. • note: addl time extension due to late water meter installation. • Funding Source:Storm Water Utility, • Parkland Dedication and 2012-2013 • Certificates of Obligation Project Contact Project Manager Mario Cruz, P.E. 915-541-4012 Design Consultant City Engineering, Ana Castillo Construction Contractor Martinez Bros. 915-584-3900 Page 2 of 2

More Related