1 / 0

Student Center Refurbishment Proposal

Student Center Refurbishment Proposal. For Students in their Food Services, Health Center, Co-curricular & Study Spaces 11/9/12. Supporting Student & Staff Health, Safety & Nutrition. Refurbishment of Food Services . Kitchen Equipment Upgrade – In Progress Central Beverage Station Upgrade

van
Download Presentation

Student Center Refurbishment Proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Student Center Refurbishment Proposal

    For Students in their Food Services, Health Center, Co-curricular & Study Spaces 11/9/12
  2. Supporting Student & Staff Health, Safety & Nutrition
  3. Refurbishment of Food Services Kitchen Equipment Upgrade – In Progress Central Beverage Station Upgrade Check-out Stand Upgrade Utensil Station Upgrade Serving Stations Upgrade Flooring and Paint
  4. Four-person Cafeteria Tables Provide More Friendly & Inviting Environment
  5. Student Community-Centered Cafeteria Tables
  6. Two-person Tables for Maximum Flexibility + Booth Seating Against Wall
  7. Health Center Renovation Advantages to Rock & Staff Room Space Double doors for student entry off Plaza Has plumbing and sink needed by Staff In the Student Center nearest the most volume of students ; good student visibility 1st floor ADA access & for emergencies out back door Close to DSRC, Cafeteria, Clubs, ASCC, Spectator Close to P.E., Athletics, Bookstore & Cesar Chavez Plaza Close to Security (even in newer location in 200) No need to remove walls or install new doorways Do not need DSA approval (?)
  8. Health Center Cont’d Refurbishment Needs Bathroom (1) Exam Rooms (2) Reception and Waiting Area Reception Counter Director, Mental Health Counselor, Staff Offices (3) New Furniture for Offices (Desks, File and Equipment Storage and Chairs) Carpet in Offices (3) Tile in Exam Rooms Storage Closet for Medical Records and Equipment
  9. If you don’t have your health…
  10. Study-conducive seating
  11. More Examples of how Comfortable Seating and New Carpet Transform Area
  12. Seating with Attached Tables
  13. Office of Student Life Refurbishment Refurbish to accommodate ASCC Executive Offices, lobby area, and conference/lounge meeting space. This will increase visibility and accessibility for ASCC.
  14. Refurbish ASCC space to accommodate OSL Student Assistants, Senators and Club activities. Needed: tables and chairs, lobby furniture, paint and floor cleaning, white boards, overhead projector, computers, printer, copy machine.
  15. Flea Market Office Refurbish two upstairs office spaces - the glass office across from the top of the stairs and office near balcony for two staff members, including Flea Market and OSL staff.
  16. Remodel Current Security Office as a Student Outreach Office One-stop shop for student resources and information and a way to promote Chabot events and opportunities, perhaps even tours of campus. Needed: existing furniture, display cases, bulletin boards, office equipment, etc.
More Related