Existing Site Plan. Upper Level Master Plan. Upper Level Education. Fellowship Hall / Admin. Plan. Worship Floor Plan. Lower Level Master Plan. Lower Level Education. Lower Level Education. Exterior Elevations. Exterior Elevations. Building Cross Sections. Phasing Key. Phase #1
E N D
Phasing Key Phase #1 $5,649,000 Phase #3 $332,500 Phase #4 $620,000 Sitework $745,000 Phase #6 $165,000 Phase #2 $985,000 Phase #5 $275,000