1 / 22

Chapter Eleven

Chapter Eleven. Quality and Assurance. Fig. 11-1. The Trade-Off Between Quality and Cost. Fig. 11-2. Probability Density of a Uniform Variate on (0, 1). Fig. 11-3. Density of the Sum of Three Uniform Random Variables. Fig. 11-4.

vartan
Download Presentation

Chapter Eleven

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter Eleven Quality and Assurance

  2. Fig. 11-1 The Trade-Off BetweenQuality and Cost

  3. Fig. 11-2 Probability Density of a Uniform Variate on (0, 1)

  4. Fig. 11-3 Density of the Sum of ThreeUniform Random Variables

  5. Fig. 11-4 Density of the Sum of ThreeUniform Random Variables andthe Normal Approximation

  6. Fig. 11-5 Frequency Histogram of 150 Measurements

  7. Fig. 11-6 Theoretical Normal Curve of Arm Length

  8. Fig. 11-7 Chart for Tracking Arm Data

  9. Fig. 11-8 R Chart for Tracking Arm Data

  10. Fig. 11-9 Preliminary p chart for Xezet floppy disk data (Refer to Example 11.2)

  11. Fig. 11-10 Revised p chart for Xezet floppy disk data (Refer to Example 11.2)

  12. Fig. 11-11 Successive Cycles in Process Monitoring

  13. Fig. 11-12 The Behavior of G(n, k) as afunction of k (Refer to Example 11.5)

  14. Fig. 11-13 The Ideal OC Curve

  15. Fig. 11-14 OC Curve for Spire Records (n = 10)

  16. Fig. 11-15 Revised OC Curve for Spire Records (n = 25)

  17. Fig. 11-16 Two Realizations of a Sequential Sampling Plan

  18. Fig. 11-17 Sequential Sampling Planfor Spire Records (Refer to Example 11.8)

  19. Fig. 11-18 ASN Curve for Spire Records (estimated)

  20. Fig. 11-19 AOQ Curves forSpire Records(Refer to Example 11.9)

  21. Fig. 11-20 The House of Quality:The QFD Planning Matrix

More Related