Investment In RE Conference - Ramallah, Palestine Ahli Wind Energy Project (AWEP) Imagination and Reality EU Funded Project . Prepared By: Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager ). Outline . Background (Ahli Hospital) Introduction (AWEP) Achievements
E N D
Investment In RE Conference - Ramallah, PalestineAhli Wind Energy Project (AWEP) Imagination and RealityEU Funded Project Prepared By: Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)
Outline • Background (Ahli Hospital) • Introduction (AWEP) • Achievements • Actual Achievements until know • Experience • Barriers • Overcoming Barriers • AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
Outline • Background (Ahli Hospital) • Introduction (AWEP) • Achievements • Actual Achievements until know • Experience • Barriers • Overcoming Barriers • AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Patients’ Friends Society Ahli Hospital – Hebron, Palestine Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
Patients’ Friends Society Ahli Hospital – Hebron, Palestine • Largest Hospital in Palestine (27,500 m2 ). • Started work on 1993. • 200 beds which will be 350 beds in the near future . • More than 470 staff members are working in the hospital which deals with more than 150,000 patients per year . Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
Outline • Background (Ahli Hospital) • Introduction (AWEP) • Achievements • Actual Achievements until know • Experience • Barriers • Overcoming Barriers • AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Introduction Ahli Wind Energy Project (AWEP) • Project Name • Integrated Wind Energy Production System for Al-Ahli Hospital • Duration: 48 Month Started 1/1/2009 • Budget: 1.644.340 EURO • EU Contribution: 79.63% = 1.309.440 EURO • AL-AhliContribution: 20.37% = 334.900 EURO Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
Introduction Ahli Wind Energy Project (AWEP) • AWEP is a pioneer project in Palestine that is funded by the EU . This project will directly benefit Al-Ahli Hospital from the Wind Energy . • Wind Turbine and Solar Thermal System will be used to achieve the goal of the project. • Objectives • To produce ~30-40 % of the hospital Power needs. • To reduce the environmental costs, such as carbon emissions. • To provide the hospital with an alternative source of power. • Increasing the awareness of the local community • Building the capacity of the hospital’s staff and its associates. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
225 KW 200 KWp – future Project 500 KW Grid meter Diesel Generator P.V System Wind Turbine System Utility Meter Intelligent Electricity Panels Hospital
Wind Turbine Planned Site Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
Grid connection for wind turbine Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Solar Thermal Panels Planned Site Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Thermal System - Block Diagram Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Thermal System Schematic Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
Outline • Background (Ahli Hospital) • Introduction (AWEP) • Achievements • Actual Achievements until know • Experience • Barriers • Overcoming Barriers • AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Actual Achievements until know • Installation of measurement station. • Already record data for 3 years. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Potential of wind at Al Ahli Site Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113 Fax: 02 - 2229061
Training, and Capacity Building • Many activities abroad and in Palestine Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Tendering and Contracting Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Workshops and Dissemination • Five workshops. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Barriers • Political Barriers (Rules & Regulations not completed). • Market Barriers. • Technical Barriers. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Overcoming Barriers • The Authorities are collaborative. • We already find market for our desire. • We’ve received a technical assistant from our EU partner in addition to local and international consultants. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Outline • Background (Ahli Hospital) • Introduction (AWEP) • Achievements • Actual Achievements until know • Experience • Barriers • Overcoming Barriers • AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Why PFS decided to invest in RE • As a medical organization aims to go green. • The power invoice of Al-Ahli Hospital is huge (reduce bill). • Investing in RE will reduce the energy bill, so give the opportunity to enhance the quality of medical service. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
EU Investments in Wind Energy Source: European Wind Energy Association Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Some Facts about AL Ahli Hospital • Electricity 1,791,045KWh/year.(2009). • Diesel 233,352 Liters /year.(2009), this is equivalent to 2,238,545 KWh/year. • Electricity consumption Invoice on 2009 = 240,000 €. • Diesel consumption invoice on 2009 = 245,950 € • Total energy consumption = 4,029,590 KWh/year • Total energy bill = 485,950€ Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Wind Turbine Expected Outcome The total operating Hours , “the wind speed above cut in speed” , of the wind turbine per year : 5800 Hours . Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Wind Turbine Expected Outcome • Electricity Saving from wind turbine = 330,000 KWh/year / 1,791,045KWh/year *100% = 18.4 % per year. • Saving of electricity bill = 18.4% * 240,000 € = 44,160 €. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Solar Thermal Expected Outcome • The daily energy required from the SWHS is 50% of the daily thermal energy consumption, which equals 2.238.545X50% = 1.119.272 • Our SWHS (Solar Water Heating System) is designed to save 1,200,000 Kwh/year; this is equivalent to a saving of 53.6% (3287Kwh/day). • The average solar radiation on the horizontal surface in Palestine is 5400wh/m2/day. • The area of the solar collector is 2.55m2 • The number of the necessary solar collectors is 355. • Each collector of this type has a supposed production of (0.77 Kwh). • The total area of the collectors is 905m2. • The hot water storage tank capacity is 5X4 m3. • The daily production of the SWHS is 23.0 m3 (at 70cº). • The annual production of SWH is 8395.5m3. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Solar Thermal Expected Outcome • Thermal energy Saving from Solar Thermal = 1,200,000 KWh/year / 2,238,545KWh/year *100% = 53.6% per year. • Saving of diesel bill = 53.6% * 245,950 € = 131829.2 € Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Total Energy Saving from Wind & Solar • Total Energy Saving From Wind & Solar = 329552 KWh\year + 1,200,00 KWh/year / 4,029,950 KWh/year * 100% = 37.9 % per year. • Total Savings = 44,160 € + 131,829.2 € = 175,989.2 € per year. Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Energy, Cost and Savings Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
Pay Back Period • Pay back period for wind turbine = 501260 € \ 44,160 € = 11.3 years. After 20 years = 9 * 44,160€ = 397,440 € • Pay back period for solar thermal = 245,950 € \ 131829.2 € = 1.86 year. After 5 years = 3 * 131829.2 = 395487.6 € Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.ps Eng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113 Fax: 02 - 2229061
With Our Best Regards………. Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager) Mrs. Asmaa Sultan (Administrative Assistant)