220 likes | 372 Views
Trinity College Universal Design Issues Access. Cobble Reduction. Access to Historic (Protected) Buildings. Slide Data Sheet. Evaluated: Date: 05/26/2008 Time: 02:53:21 Slide number: 2 Number of objects: 3 Sizes: Slide total: 980.0 KB Background: 512 Bytes
E N D
Trinity College Universal Design IssuesAccess Cobble Reduction Access to Historic (Protected) Buildings Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:53:21 Slide number: 2 Number of objects: 3 Sizes: Slide total: 980.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesAccess Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:53:50 Slide number: 3 Number of objects: 7 Sizes: Slide total: 2.1 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 10.0 KB Trinity College Universal Design IssuesTemporary/immediate solutions Hide Erase House 39 – Law School Anatomy Building Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:04 Slide number: 4 Number of objects: 6 Sizes: Slide total: 941.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions Historic Buildings Hide Erase Front Square Houses New access ramps Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:25 Slide number: 5 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - Historic Buildings Hide Erase House 27 Entrance to Catex Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:44 Slide number: 6 Number of objects: 7 Sizes: Slide total: 1.7 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions Historic Buildings Hide Erase The Old Library The GMB (Sounder/beacon retrofitted) Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:04 Slide number: 7 Number of objects: 5 Sizes: Slide total: 1.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions Historic Buildings Hide Erase Cobble Reduction Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:30 Slide number: 8 Number of objects: 7 Sizes: Slide total: 1.9 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - New Buildings Hide Erase SNIAMS (automatic doors) East End 4/5 Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:58 Slide number: 9 Number of objects: 8 Sizes: Slide total: 1.6 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - New Buildings Hide Erase Berkeley Podium (ramp) Ussher Podium (platform lift) Sounder/beacon retrofitted) Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:16 Slide number: 10 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - Existing Buildings Hide Erase Lecky Library (Arts Building) Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:33 Slide number: 11 Number of objects: 7 Sizes: Slide total: 2.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions- New Buildings Hide Erase Ussher/Berkeley Library (ramp and lift) Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:46 Slide number: 12 Number of objects: 8 Sizes: Slide total: 1015.0 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesGeneral Facilities Hide Erase UA Toilet Desiginated Parking Bay Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:03 Slide number: 13 Number of objects: 6 Sizes: Slide total: 2.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions- New Buildings Hide Erase Ussher/Berkeley Library (ramp and lift) Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:34 Slide number: 14 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesInterim solutions Hide Erase Portable Ramp Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:38 Slide number: 15 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesGeneral Requirements • Mobility: ease of access for all • Hearing: Induction loops, strobe alarms • Vision: Tactile clues, lighting, audible alarms Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:41 Slide number: 16 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCompleted Projects – Lecture Halls • Accessible for all new buildings • Note: Access to lecture theatres in old buildings to be considered. Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:44 Slide number: 17 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCompleted Projects – Goldsmith Hall Residences • All units accessible by lift • All units ‘visitable’ and adaptable when required. • Specifically designed bathrooms available. Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:47 Slide number: 18 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCompleted Projects – Botany Bay Residences Refurbishment Provision of 9 no places in 3 no. units • Each unit is fully adapted to suit Universal Design requirements • Including specifically designed kitchens and bathrooms • In addition facilities can be provided for both the visually impaired and deaf persons in the remaining units. Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:49 Slide number: 19 Number of objects: 4 Sizes: Slide total: 106.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCurrent Programs/Projects - Trinity Hall Residences Each of the three new buildings is fully accessible All apartments are'visitable‘ • 45 of 938 bed spaces are enabled bed spaces with specially designed toilet/showerfacilities with 'nurse call' system centrally monitored and enabled kitchenfacilities. • Each apartment has an 1800 turning circle for wheelchair access. • All switches, door furniture etc are universally accessible-visibility socket switches fitted • Specifically designated parking bays • Provision of facilities for both the visually impaired and deaf occupants. Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:52 Slide number: 20 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPriority List 1 • GMB: internal lift • The Pavilion Bar: platform lift. • East Theatre: automate entrance door. • Arts Building (Faculty Area): automate doors/platform lift • Chemistry Building: improve access to Large Lecture Theatre. • Physiology/Zoology Building: Access provision. • The Boathouse: provision of UA toilets • Santry Pavilion: provision of UA toilets/changing room Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:55 Slide number: 21 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPriority List - General • Induction Loop System • Deaf alerter – Fire Alarms. • Cobble reduction. • Improve external/internal circulation routes • Visual/tactile provisions. Hide Erase Director of Buildings' Office
Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:57 Slide number: 22 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesFor Consideration • Front Square: Access provision/automate doors • Provost’s House: Access provision. • New Square: Access provision/automate doors • East End: Improve access to existing buildings. • Islandbridge: improve access/lift installation/UD facilities. • Santry Pavilion: improve access/lift installation/UD facilities. Hide Erase Director of Buildings' Office