University Systemof Maryland Collaborative Upgrade Strategies Presentation November 11, 2005
University Systemof Maryland Introductions Steven Kish Elizabeth Malmborg Patrick Murray Ken Kish
University Systemof Maryland Presentation Premise Economies of scale and efficiencies can be realized by having several similar institutions coordinate activities during an upgrade.
University Systemof Maryland Agenda • Introduction – Io Consulting • Case Study – California State University Project • Project Organization • Baseline Concept • Development Guidelines • Upgrade Methodology • Upgrade Teams / Pilots • Realized Benefits • Alternate Upgrade Approaches • Applicability at USM
University Systemof Maryland Io Consulting – fun facts • Incorporated in 1996 • 100% Focused on Higher Education • Major Practices • Human Resources • Finance • Student Administration (including Portal & CR) • Training • Oracle partner • Experience dates to HR 3.0, Finance 2.0, SA 7.0
University Systemof Maryland Io Consulting – Clients • Bryn Mawr University • Emory University • Pepperdine University • Stanford University • California State University System > 20 campuses
University Systemof Maryland Io Consulting – Recent Experience • PeopleSoft 8.9 Testing • Bryn Mawr HCM 8.9 upgrade • CSU HCM 8.9 upgrades • CSU FIS 8.9 upgrades • CSU HR, SA 8.9 implementations • Pepperdine HR, FIS 8.9 implementation
CSU CMS Project History • 23 Campus implementations of HR, SA, FIS by 2008 • 1999 – Project start • 2000 – 11 campuses live HR 7.6, FIS 7.5 • 2001 – HRSA upgrade to 8.0 • 2002 – First SA go lives (3), 11 upgrade to 8.0 • 2003 – FIS 8.4 upgrade starts • 2004 – 20 campuses live FIS 8.4 • 2005 – HCM, FIS 8.9 upgrades
CSU CMS Project Current Status • 22 campuses live – HR 8.0 • 21 campuses live – FIS 8.4 • 10 campuses live – SA 8.0 • Between 2006 – 2008 • 22 HCM upgrades to 8.9 • 21 FIS upgrades to 8.9 • 2 HR implementations 8.9 • 3 FIS implementations 8.9 • 13 SA implementations 8.9
CSU CMS Project Organization • Collaborative / Common Project • CMS Central (CO) – software development • Outsourced Datacenter • Campus representatives – User Groups • HR • Finance • Student Administration • Campus representatives – Project Directors • Campus / CO representatives – Executive Committee
CSU CMS Project Organization • Joint design/development activities • Baseline concept • Provisions for campus modifications • Common, outsourced data center
CSU CMS Project Baseline System • PS Vanilla plus • Common Configuration • Common Modifications • PS Updates & Fixes • State/CO Reporting • Campus Modifications • Reporting • Interfaces • Self Service • Security
CSU CMS Project Baseline Campus Baseline PeopleSoft
CSU CMS Project Development Guidelines • Established at the start of the project to streamline upgrades • Bolt-on modifications • Naming conventions • Allows for common code line and campus modifications • Critical decision to allow for joint design & projects
CSU CMS Project Upgrade Methodology • Perform joint fit/gap sessions to compare baseline to the new release. • CMS Central performs a baseline upgrade • CMS Central develops baseline modifications • Allows for a common set of code that can be applied to each campus quickly and efficiently • Utilize pilot campuses to test data conversion • A single team in CMS Central performs all the upgrades – new concept with 8.9
CSU CMS Project Upgrade Methodology Deliverables • Baseline set of code. • Upgrade instructions / technical upgrades • Modifications to conversion scripts if necessary • Configuration documentation • Business process documentation • Template test scripts • Technical delta roadmap
PS Upgrade Methodology Campus 8.9 8.0 Data Prepare Database Release Scripts Compare Analysis Tools Copy Data Conversion Cleanup Security Setup Conversion Tools 8.4605 Demo 8.9 Data Tools
CSU Upgrade Methodology Campus 8.9 8.0 Data Prepare Database Release Scripts Tools Copy Data Conversion Cleanup Security Setup Conversion Tools 8.4605 CMS 8.9 Data Tools
CSU Upgrade Methodology • Upgrade Team • Pilot Campuses
CSU Upgrade Methodology Benefits • Eliminate tasks that are largely redundant in the process • Builds focused, internal upgrade expertise • Baseline allows campuses to collaborate and assist each other • Creates an environment where best practices are discussed • Reduced overall cost / effort • Provides benefits to campuses of differing ability
Alternate Upgrade Approaches Single Campus Upgrade - Pros • Flexibility • Reduced technical logistics • Reduced design logistics • Data Conversion issues vary from campus to campus
Alternate Upgrade Approaches Single Campus Upgrade - Cons • Upgrades are periodic in nature • Consulting requirements increase • Troubleshooting skills • No coordinated, joint planning • Increased collective workload
Alternate Upgrade Approaches Lab Upgrade - Pros • Eliminates/Reduces learning curve • Reduces internal resource requirements – technical upgrade
Alternate Upgrade Approaches Lab Upgrade - Cons • No internal expertise is built • Logistical issues • Team continuity • Connection between application teams & upgrade team
Applicability Beyondthe CSU Key issues • Ability to cooperate • Coding guidelines • Collaborative design • Similarity of institutions • Technical architecture logistics • Participation volume • Priority of flexibility vs. cost & efficiency