Wind turbine for hurricane-prone regions. Senior Design Team 12 : Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper Rayford Rahming Christian Scott. Problem Statement Develop a conventional wind turbine capable of surviving hurricane-force wind conditions.
E N D
Wind turbineforhurricane-prone regions Senior Design Team 12: Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper RayfordRahming Christian Scott
Problem Statement Develop a conventional wind turbine capable of surviving hurricane-force wind conditions. Specifications • Capable of conventional turbine functionality • Capable of survival in hurricane force winds • Environmental-friendly • Economically feasible
Our Design Horizontal-Axis Turbine Quadruped-Foundation Hinged Tower with Counterweight • Systems • Induction Generator System • Control System • Braking System • Hydraulic Drive System Wind Turbine
Problems to Address with Micro Controller • During the raising/lowering process • When is it finished? • Possible Solutions • Hydraulic Cylinder State • Time-based
Materials Wind Turbine – Induction Generator Microcontroller Data-Logging Anemometer New Turbine Blades
Materials (continued) Hydraulic Power Unit with Solenoid Control Switch Hydraulic Cylinder
Located in Thomasville, GA. Southern Division focuses primarily on the Southeast Greg Orff – General Manager
Machine Shop Cutting pipes at 60° angles Completed Legs Welding on Gussett Plates
Machine Shop (continued) Completed Upper Assembly Welding of Upper Assembly Drilling holes in Gussett Plates
Theoretical Performance • MATLAB – Simulink • Simulink block diagram is fully constructed with minor issues to be worked out. • Provides time-based performance information in graphical form • Flow rate (hydraulic fluid) • Pressures • Forces • Issues • Additional assistance • Certain component specifications need to be known
Expectations • Finding a location for permanent placement • Functional lowering mechanism • Power production • Estimated Completion Date: April 1, 2013 • Remainder of time for operating and testing the system