An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capital Improvement Plan May 8th, 2013 Presented by City Administration: • Public Works Department • Finance Department

  2. Capital Improvement Plan Capital Projects Streets Buildings Canals Utilities Parks

  3. CIP Buildings • City Hall • Community Affairs Center (CAC) • Champions Hall Community Center • Public Works Compound Buildings • Aquatic Center • Parks Buildings • Old Senior Citizen Center • Fire Station #34 • Fire Station #44 • Teen Center • School Structure

  4. CIP Buildings • Major Maintenance Items • Roofing • A/C Systems • Generators

  5. CIP Buildings • CIP Short Term Items • A/C Systems – City Hall, CAC, CH, PWB, Aquatics, PB, Old Senior Center, FS #44 • Generators – City Hall, FS #44 • Roofing – City Hall, CAC, CH, PWB, Aquatics, PB, Old Senior Center, FS #44, School • CIP Long Term Items • A/C Systems – FS #34, Teen Center • Generators –FS #34, Teen Center • Roofing – FS #34, Teen Center

  6. CIP Parks • Major Maintenance Items • Turf Replacement • Field Lighting • Structures

  7. CIP Streets • Approximately 72 miles of Roadways • Major Roads: Kimberly, Rock Island, 81st Ave, Southgate • Minor Roads: Tam O’Shanter, Sussex, Hampton, Boulevard of Champions • Subdivisions • - Private Roads • - Public Roads • Broadview and Pompano Park Not Included in Estimates and Roadway Calculations

  8. CIP Streets

  9. CIP Streets • Major Maintenance Items • Resurfacing / Milling • Curbing • Sidewalks • Drainage • Swales

  10. CIP Streets • CIP Short Term Items • Resurfacing / Milling – Major and Minor, SW 17th Street , Subdivisions • Drainage (Need Study) • CIP Long Term Items • Curbing • Sidewalks • Swales

  11. CIP

  12. CIP Utility Infrastructure • Water Production • Sewer

  13. CIP Plan Utility Infrastructure • Water Production • Water plant upgrade will be completed soon • Current City Fire hydrant spacing meets regulations • Most older undersized mains have been replaced • Most older service lines (galvanized) have been replaced with PVC • No major capital expense foreseen as major improvements were completed in the 80’s and 90’s

  14. CIP Utility Infrastructure • Sewer • 29 Lift stations (3 different styles) • - 21 Submersible pumps • - 4 Suction lift • - 4 Can stations • 54 Miles of gravity sewer mains • - 17 miles PVC • - 37 miles of Clay pipe • 1 million gallons of daily excess inflow and infiltratration into the sewer system

  15. CIP Utility Infrastructure • Sewer Large User Agreement with Broward County Waste Water Authority • Original 3.35 MGD’s (1979) • In addition 0.05 Purchased from Pompano (1995) • In addition 0.06 Lease from Coconut Creek • In subtraction 0.06 Back to Coconut Creek • In addition 0.40 Purchase from Lauderhill (2003) • In addition 0.60 Purchase from County (2009) • 4.40 Current MGD’s

  16. CIP Utility Infrastructure • Major Maintenance Items • Clay Gravity Sewer Main Lining • Lift Station upgrades

  17. CIP • Utility Infrastructure • CIP Short Term Items • Gravity Sewer Lining (Need Study) • Lift Station Upgrades • CIP Long Term Items • Gravity Sewer Lining

  18. CIP Plan Canals • The City maintains 5.21 miles of canals • 12 Canal Zones in the City • 132.9 surface acres of waterways and lakes

  19. CIP Plan Canals

  20. CIP Plan Canals

  21. CIP Plan Canals

  22. CIP Plan Canals • Major Maintenance Items • Outfalls • Canal Banks • Dredging

  23. CIP Plan Canals • CIP Short Term Items • Outfall Repairs • CIP Long Term Items • Canal Banks • Dredging

  24. CIP Parks • CIP Short Term Items • Turf Replacement • Structures • CIP Long Term Items • Field Lighting

  25. Capital Improvement Plan Capital Projects ($96.8 Million) Buildings • $2 Mill Parks $4.3 Mill Utilities • $32.5 Mill Canals $31 Mill Streets • $27 Mill

  26. CIP Plan

  27. CIP

  28. CIP