10 CFR Part 61: Licensing Requirements for Land Disposal of Radioactive Waste

10 CFR Part 61: Licensing Requirements for Land Disposal of Radioactive Waste. Gregory Suber, Branch Chief Environmental Protection & Performance Assessment Directorate Division of Waste Management and Environmental Protection Organization of Agreement States 2011 Annual Meeting.

vida
Download Presentation

10 CFR Part 61: Licensing Requirements for Land Disposal of Radioactive Waste

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 10 CFR Part 61: Licensing Requirements for Land Disposal of Radioactive Waste Gregory Suber, Branch Chief Environmental Protection & Performance Assessment Directorate Division of Waste Management and Environmental Protection Organization of Agreement States 2011 Annual Meeting

  2. LLW 101: Background • Early LLW disposal practices included • Ocean Dumping (~ 60 sites) • Shallow Landfills (~16 sites) • 1960s: Commercial Disposal Operations Approved by the AEC • Six sites • Licensed under Part 50 • Economics • $5.15/drum (land) • $48.75/drum (ocean)

  3. LLW 101 (continued) • Developments …. • London Convention of 1972: Ban on ocean dumping • Problems at Operating Disposal Sites • Leaks • Ground failures • NRC Actions • 1977: LLW Task Force Formed • 1978: NRC Publishes Part 61 ANPR • 1980: Final Part 61 Rule in Place

  4. 10 CFR Part 61 • Regulatory Framework • Standardize LLW disposal practices • Develop umbrella regulation • Scoping process consistent with NEPA • Limited to commercial waste streams • 37 waste streams • 24 radionuclides of interest

  5. Part 61 Regulatory Philosophy • Waste Segregated by Radiological Hazard • Integrated Management, Based on a ‘Systems’ Approach • Multiple barriers • Geologically suitable/stable site • Employ specific (yet limited) design features • Stabilize the waste

  6. Summary: I Believe Part 61 is …. • Non-prescriptive • Limited sitting/design/engineering requirements • Waste segregated • Reliance on institutional controls • Risk-informed • Potential waste streams understood • Waste managed in context of Subpart C performance objectives

  7. Recent Events • Depleted Uranium Decision-Making • DU is Class-A LLW • NRC amending Part 61 to include an explicit performance assessment requirement (per SECY-08-0147) • NRC Reprocessing Regulatory Initiative • New, emerging LLW streams • Update to NRC Concentration Averaging BTP • SECY-10-0043

  8. Comprehensive Revision to Part 61 • Commission Directed the Staff to … • Seek stakeholder views on possible amendments • Focus on regulatory approaches that are risk-informed/performance-based • SECY-10-0165 Issued December 27, 2010 • Staff Identified 5 Potential Options

  9. Potential Rulemaking Options • Risk-Inform Current Part 61 Waste Classification Framework Option • Re-evaluate §61.55 waste classification tables • Apply updated ICRP dosimetry • Comprehensive Revision Option • Start with blank slate • Re-do earlier Part 61 studies • Rely on new information and updated assumptions

  10. Options (continued) • Site-Specific Waste Acceptance Criteria Option • Modeled after DOE Order 435.1-1 • Performance-based directive based on specific site and design • Does not rely on generic waste classification tables (§61.55) • International Alignment Option • Based on IAEA Geologic Safety Guide (GSG)-1 • Focuses on all radioactive waste streams, including LLW • Maintain status quo • No further action

  11. Next Steps • First NRC Public Meeting on March 4, 2011 • Joint DOE/NRC workshop • http://www.nrc.gov/about-nrc/regulatory/rulemaking/potential-rulemaking/potential-part61-revision.html • Future Public Meetings Expected • Timetable depends on completion of ongoing site-specific analysis rulemaking (SECY-08-147) • Schedule also depends upon resource availability

  12. Decommissioning Planning Final Rule:General Information • Published in the Federal Register on June 17, 2011 • Effective Date for licensees: December 17, 2012 • Date for Agreement State adoption of compatible regulations: December 17, 2015 • NRC Contact: Rob MacDougall - 301.415.5175 - Robert.MacDougall@nrc.gov