1 / 8

CTSSv3 Cutover Checklist Draft 3

CTSSv3 Cutover Checklist Draft 3. JP Navarro, Lee Liming May 25, 2006. Operations. New routing instructions for mds.teragrid.org problems to GIG services (June 5) Change routing instructions for CTSSv3 problems to site admins (June 19) Monitoring changes? (June 19) Any other tasks?.

vielka-diaz
Download Presentation

CTSSv3 Cutover Checklist Draft 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CTSSv3 Cutover ChecklistDraft 3 JP Navarro, Lee Liming May 25, 2006

  2. Operations • New routing instructions for mds.teragrid.org problems to GIG services (June 5) • Change routing instructions for CTSSv3 problems to site admins (June 19) • Monitoring changes? (June 19) • Any other tasks?

  3. Documentation • Post software keys documentation draft (June 5) • Post details about $TG_EXAMPLES/.soft.ctssv3 template (June 5) • Transition CTSSv3 testing page (June 19) • Transition tgcp/data movement pages (June 19) • Transition GRAM documentation pages (June 19) • Transition srb-client documentation (June 19) • Transition CTSSv3 and software keys documentation (June 19) • Any other tasks?

  4. User Services • Send users a heads up notification (June 5) • Make point about users transitioning their own environments • Make point about new service hostnames and ports • Point to GT4 testing page • Review testing results and make go/no-go decision (?) • Send users a notification of cutover (June 16 or 18) • Make point about users transitioning their own environments • Make point about new service hostnames and ports • Point to updated documentation

  5. Software WG, GIG SI • Critical production Inca tests deployed (May 16) • Software-wg checkoff that critical Inca tests are the right tests (May 30) • Update CTSSv3 spreadsheet with latest status (May 22, 29, June 5) • Review testing, software, service status and make go/no-go decision (?)

  6. Service Transition - GridFTP • gridFTP/tgcp (software-wg, data-wg) • Sites notify data-wg of their production gridFTP config (May 26) • Production gridFTP config provided to documentation group (May 30) • Define gt2-gridftp alias for GT2 gridFTP host (June 9) • tgcp configuration checkout freeze (June 9) • Production tgcp configurations in repo cvs (June 16) • Move GT2 gridFTP service from tg-gridftp:2811 to gt2-gridftp:2812 (June 19) • Define tg-gridftp dns alias to round-robin to all GT4 striped gridftp data movers (June 19) • Move GT4 gridFTP services from tg-gridftp:2812 to tg-gridftp:2811 (June 19) • Download and install production tgcp configuration (June 19)

  7. Service Transition - other • Gram (software-wg) • Move GT2 GRAM service from <host>:2119 to <host>:2120 (June 19) • Move GT4 pre-WS GRAM service from <host>:2120 to <host>:2119 (June 19) • GT4 Web Services container (GRAM, RFT, MDS) • No service transition needed • GT4 RLS • No service transition needed

  8. Software Transition • User environment/software transition (software-wg, services-wg) • New software environment keys standardized (June 2) • New software keys deployed (June 5) • New $TG_EXAMPLES/.soft.ctssv3 template deployed (June 5)

More Related