1 / 26

4 TH AFRICAN CROSS-SECTORAL EXPERTS WORKSHOP ON THE 2050 AIM-STRATEGY 19-21 APRIL 2012, ADDIS ABABA, ETIHOPIA

4 TH AFRICAN CROSS-SECTORAL EXPERTS WORKSHOP ON THE 2050 AIM-STRATEGY 19-21 APRIL 2012, ADDIS ABABA, ETIHOPIA. 1. OUTLINE. KOÇ GROUP & RMK MARINE REQUIREMENT ANALYSIS RMK MARINE’S APPROACH COAST GUARD SEARCH AND RESCUE VESSEL (CG SAR) MULTIROLE OCEAN PATROL VESSEL (OPV)

vina
Download Presentation

4 TH AFRICAN CROSS-SECTORAL EXPERTS WORKSHOP ON THE 2050 AIM-STRATEGY 19-21 APRIL 2012, ADDIS ABABA, ETIHOPIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4THAFRICAN CROSS-SECTORAL EXPERTS WORKSHOP ON THE 2050 AIM-STRATEGY 19-21 APRIL 2012, ADDIS ABABA, ETIHOPIA 1

  2. OUTLINE • KOÇ GROUP & RMK MARINE • REQUIREMENT ANALYSIS • RMK MARINE’S APPROACH • COAST GUARD SEARCH AND RESCUE VESSEL (CG SAR) • MULTIROLE OCEAN PATROL VESSEL (OPV) • FAST ATTACK CRAFT (FAC) • WORKSHARE AND TRANSFER OF TECHNOLOGY 2

  3. KOÇ GROUP & RMK MARINE 3

  4. KOÇ GROUP - SHAREHOLDER OF RMK MARINE Largest Private Conglomerate in Turkey Employees : ~ 90,000 Sales (2011) : 40 Billion USD Exports(2011) : 18 Billion USD

  5. #6 #3 #5 #7 KOÇ GROUP - SHAREHOLDER OF RMK MARINE Global Player • 2011 : 248 • 2010 : 273 • 2009 : 172 • 2008 : 186 • 2007 : 190 Global 500 • 2010 : 71 • 2009 : 56 • 2008 : 46 • 2007 : 49 #1 European 500 Listed Companies ** Istanbul Stock Exchange 5 KOÇ HOLDING COMPANIES IN TURKEY’S TOP 500

  6. KOÇ GROUP - SHAREHOLDER OF RMK MARINE Focused Growth Strategy Main Companies Otokar / Türk Traktör International Alliances Case New Holland Main Companies Yapı Kredi Bankası International Alliances UniCredit Main Companies Ford Otosan / Tofaş International Alliances Ford Motor Co. / Fiat Auto S.P.A. Case New Holland / Yamaha Main Companies Arçelik / Grundig Elektronik International Alliances LG Electronics (Arçelik LG) Main Companies Tüpraş / Aygaz / Opet / Entek International Alliances Statoil (Koç Statoil) Energy Automotive Consumer Durables Finance Defence

  7. SHIPYARD 7

  8. BUSINESS • DESIGNS & BUILDS • Naval Ships • Landing Platform Dock Ship • Landing Ship Tank Ship • Coast Guard Search & Rescue Vessel • Multi-Role Patrol Vessel • Fast Attack Craft • Superyachts • Oyster Superyachts • Motor Yachts • Commercial Vessels • Chemical & OilTankers, • OffshoreSupply Vessels • Tugboats 8

  9. MISSION PROFILE of OPVs • EEZ CONTROL • TRAFFIC CONTROL • ANTI-SMUGGLING • FISHERY PROTECTION • NAVAL OPERATION • INTERDICTION • PATROL OF NAVIGATION ROUTES • INTEGRATION AND JOINT TASK OPERATION • SEARCH AND RESCUE • ENVIRONMENTAL CONTROL 9

  10. OPERATIONAL CAPABILITIES • Law Enforcement • Maintenance of Border Integrity and Maritime Security • Protection of Off-shore Activities • Anti-Smuggling Operations • Anti-Piracy Operations • Protection of Fisheries and Maritime Resources • Prevention of Illegal Fishing • Disaster Relief and Humanitarian Aid • Search and Rescue 10

  11. RMK MARINE’S APPROACH • COAST GUARD SEARCH AND RESCUE VESSEL (CG SAR) (36 Months) • MULTIROLE OCEAN PATROL VESSEL (OPV) (28 Months) • FAST ATTACK CRAFT (FAC) (15 Months) 11

  12. RMK MARINE’S APPROACH • Coast Guard Search & Rescue Vessel • Helicopter operation capability w/ Helo Hangar • Speed : 22+ Kts • Endurance: 21 days • Fast Attack Craft • Speed : 35+ Kts • Endurance: 7 days • Multi-Role OPV • Speed : 28+ Kts • Endurance: 14days Commercial in Confidence

  13. RMK MARINE’S APPROACH • Coast Guard Search & Rescue Vessel • Helicopter OperationCapability w/ Helo Hangar • Speed : 22+ Kts • Endurance: 21 days • Fast Attack Craft • Speed : 35+ Kts • Endurance: 7 days • Multi-Role OPV • Speed : 28+ Kts • Endurance: 14days Commercial in Confidence

  14. RMK MARINE’S APPROACH INTEGRATED ISR CENTERS and REGIONAL BASES COVEREAGE Radii of ~ 500 nm OCEANIC FIELDS FORESEEN 14

  15. COAST GUARD SEARCH/RESCUE VESSELS Patrol Mission Prevention of Smuggling Search and Rescue Pollution Prevention Oil spread limitation Oil Recovery Pollution Collection Oil Dispersant Oil Neutralizing OPERATIONAL REQUIREMENTS FOR CG SAR VESSEL Fire Fighting

  16. COAST GUARD SEARCH/RESCUE VESSELS • Largest Naval Platform Project built by Private Sector in Turkey • RMK Marine under contract with SSM • Four CG SAR Vessels arebeing • designed, constructed, outfitted, tested by RMK Marine • delivered to SSM together with Integrated Logistics Support package • Project started in 2008 • First ship ready to be delivered • Second and Third ships are at Sea Trials • Fourth ship to belaunched in June 2012

  17. COAST GUARD SEARCH/RESCUE VESSELS • Maximum Speed : 22+Knots • Sailing Range : 3,000 nm @ 15 kts • Endurance: Up to 21 days • Complement: 72 + 20 • Astern Speed : 8 Knots • Length Overall : 88.60m • Length B.P. : 80.00m • Breadth : 12.20m • Draught : 3.61 m • Full load displacement : 1,700 t

  18. COAST GUARD SEARCH/RESCUE VESSELS Weapons 1 x 40 mm Forward Gun 2 x 12.7 mm Heavy MachineGun • Electronic Systems • Command and Control Systems • Search radar • E/O Director • Navigation Radar • Communications System Helicopter Landing Visual Lighting Main Engine 2x5200 kW Generator 2x900 kW Search and Rescue Fire Fighting Systems

  19. MULTI-ROLE COAST GUARD VESSEL PROJECT E/O Radar, Air and Surface Search Radar 2 x 12,7 mm Stabilized MachineGuns 40 mm Gun 2 x RHIB Boats SternRamp Reduced RadarCrossSection 2 x 4,600 KW MainEnginesprovidespeed of 28+ kts 19

  20. MULTI-ROLE COAST GUARD VESSEL PROJECT • Length Overall : 66.00 m • Breadth : 10.50 m • Draught: 3.00 m • Full load displacement : 700 t • Maximum Speed : 28+ Knots • Cruising Range : 2,000 nm @ 15 kts • Endurance :14 days • Complement :25 20

  21. FAST ATTACK CRAFT PROJECT

  22. FAST ATTACK CRAFT PROJECT • Length Overall : 42.00 m • Breadth : 6.80 m • Draught: 2.00 m • Full load displacement : 240 t • Maximum Speed : 35+ Knots • Cruising Range : 2,000 nm @ 15 kts • Endurance : 7 days • Complement :8 + 12 Special Force 22

  23. WORKSHARE AND • TRANSFER OF TECHNOLOGY 23

  24. WORKING TOGETHER African Navies’ short-mid-long term needs can be met by Africa’s own resources with an increasing rate. • At Phase-1 (0 – 4 years) • Use of the platforms to be provided by RMK Marine will reply immediate needs • Existing shipyards (if any) will be upgraded and maintenance & repair capabilities will be gained in local • At Phase-2 (4 – 10 years) • Manufacturing and Construction work packages will be completed in block-level • Gaining practice in outfitting of electronic systems and armaments • At Phase-3 (10 years – beyond) • Marine Engineering skills to be utilized • Indigenous naval platform development effort to be initiated

  25. FOR FURTHER COMMUNICATION Website: www.rmkmarine.com LOCATION : RMK Marine A.Ş. Gemi Yapım Sanayii ve Deniz Taşımacılığı İşletmesi A.Ş.Evliya Çelebi Mah. Tersaneler Caddesi No:1234944 Tuzla/ İstanbul – TURKEY

  26. WORKSHOP ON THE 2050 AIM-STRATEGY 19-21 APRIL 2012, ADDIS ABABA, ETIHOPIA • THANK YOU 26

More Related