1 / 26

Lianyungang China Shipping Sea-Railway multimodal transport service introduction

Lianyungang China Shipping Sea-Railway multimodal transport service introduction. Agenda. Company Profile The First Eurasia Continental Bridge Railway Transport Profile The New Bridge Transportation Introduction Successfully operated auto transportation cases

vince
Download Presentation

Lianyungang China Shipping Sea-Railway multimodal transport service introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lianyungang China Shipping Sea-Railway multimodal transport service introduction

  2. Agenda • Company Profile • The First Eurasia Continental Bridge Railway Transport Profile • The New Bridge Transportation Introduction • Successfully operated auto transportation cases • Service Router • contact detail

  3. China Shipping Container Lines Co.,Ltd(CSCL(H)02866,CSCL(A)601866) is a specialized corporation affiliated to China Shipping (Group) Company Website :WWW.CSCL.COM.CN Lianyungang China Shipping Co. Ltd.

  4. Introduction for global lines of CSCL Over 50 major routes and feeder service both domestically and internationally. Worldwide: • Europe line • America line • Asia line • Africa line • Persian Gulf line • Australia line

  5. CSCL have launched the container service to wouldwide,and takes the advantage of the mutual promotion edge of Domestic and Foreign Intermodal Transports ,Transport Network of Railway and Sea and the integration of Container Terminal , Container Yard, and Truck Transport, and is dedicated to providing the high quality Intermodal Door to Door service, most competitive pricing and a convenient one- stop shop for your shipping needs. Address : 5F,No45,ZhonghuaXi,Rd., Lianyungang,Jiangsu,P.R.CHINA

  6. Lianyungang China Shipping’s basic tenet is customer and service first, is extending its transportation services from overseas to continentally, thus supply you the convenient and fast service on shipping and sea-railway multimodal transport. Ongoing Business of LianyungangCS

  7. Agenda • Company Profile • The First Eurasia Continental Bridge Railway Transport Profile • The New Bridge Transportation Introduction • Successfully operated auto transportation cases • Service Router • contact detail

  8. The First Eurasia Railway Transport Route Moscow Khabarovsk Vostochny

  9. Agenda • Company Profile • The First Eurasia Continental Bridge Railway Transport Profile • The New Bridge Transportation Introduction • Successfully operated auto transportation cases • Service Router • contact detail

  10. Moscow Ileck Alataw(Dostky) Vostochny LianYunGang New Eurasian Continental BridgeRailway Transport First Eurasia 24days Khabarovsk 13days New Bridge • First continental railway westbound from Vostochny to Moscow. (Total24days) • New Eurasian continental bridge railway transport westbound from Lianyungang to Moscow. (Total13days)

  11. Introduction for New International Through Railway Transport Service The New Eurasian Continental bridge is a westbound railway transport from Lianyungang, China to Rotterdam, the Netherlands, with a total length of 10,900 km and about 4,170 km in China from east to west via Jiangsu, Anhui, Henan, Shaanxi, Gansu, Xinjiang six provinces and autonomous regions of the country, which neighbor to Shandong, Shanxi, Hubei, Sichuan, Qinghai, Ningxia and Inner Mongolia, and other places, covering nearly 3.6 million square kilometers of Chinese territory, with a regional population of about 400 million, accounting for about 30 percent of the country. Besides China, new Eurasian Continental Bridge radiates also over 40 countries throughout the Asia-Europe regions. New Eurasian Continental Bridge in China's western integration is to accelerate the process of economic globalization, the new Silk Road glory remodeling.

  12. Current background and introduction of China railway service • China shipping group and China railway group together setup the block line from Lianyungang to Moscow, which is the first time for transit express containers extending from central Asia to Europe. • 5 fixed regulations is the specialty for this line: fixed station, fixed routing, fixed time, fixed train number and fixed freight. • A total of 48 carriageper train, carrying 96 international standard 20-foot containers, and transport along the new Eurasian Continental Bridge 13 days to reach Russia.

  13. Definite of ‘Five Fixed’ Character of Five Fixed • Fast speed:850KM/day • Simple process:one-stop service • Charge once:transparent freight • Safety:promise the lead time • Fixed station:fixed startup and end station • Fixed routing: fixed line • Fixed train number: • Fixed time:fixed lead time • Fixed freight:

  14. After compared with the First Eurasia Continental Bridge Railway Transportation, the New Bridge Transportation has advantages at route of transportation, freight, speed of transport, ability of customs clearance, ability of information services. The main advantages are as below: 1.Shorten the distance 2.Decrease lead time 3.Excellent geographical location and climatic conditions, the entire bridge away from the alpine region. Port without freezing period, natural conditions and throughput capacity, natural conditions of eastern startup are goodconvenient location, mild climate and can be uninterrupted operation throughout the year. 4.Convenient operation without reload from ship to railway at other countries. Advantage of The New Bridge Transportation Introduction

  15. Delivery to West Europe through railways ST.Petersburg Moscow Khabarovsk First Eurasia Alataw Vostochny New Bridge LianYunGang new express train direct to central Asia

  16. Before and after the establishment of the new Eurasian continental bridge Comparative data 5M tons 55days 0.5M TEU 0.2M TEU 90,000TEU 20days 15,000TEU 0.7Mtons From China Railway web Deadline at 2008

  17. Agenda • Company Profile • The First Eurasia Continental Bridge Railway Transport Profile • The New Bridge Transportation Introduction • Successfully operated auto transportation cases • Service Router • Contact Detail

  18. Successfully operated auto transportation cases Route of the case:

  19. ROUTE 2.LianYunGang Alataw Moscow (Total 13days) Route of the Successfully Cases Moscow 28 days ManZhouLi Alataw 13days LYG-MOS NC-MOS ROUTE 1.NanChang ManZhouLi Moscow (Total 28days)

  20. China shipping provides further help to occupy the RUS market and level up the marketing competitiveness. Shorten the response to market at least 10days Decrease the whole logistics cost for export One-stop service strengthens transportation control, Increase the transparency of information and reduce the risk of goods Providing various logistics operation model to meet customer’s needs Certainly platform could be settled for the block line to simplify the process of customer clearance Successfully operated cases

  21. Agenda • Company Profile • The First Eurasia Continental Bridge Railway Transport Profile • The New Bridge Transportation Introduction • Successfully operated auto transportation cases • Service Router • contact detail

  22. China: Shekou/Nansha (or around, 4250 TEU vessel) to Lianyungang 60 hours sailing schedule directing. Shanghai/Qingdao to Lianyungang feeder. Japan: Tokyo/Yokohama/Nagoya to Lianyungang 4 or 5 days sailing schedule directing. Hakata/Moji to Lianyungang 3 or 4 days sailing schedule directing. Korea: Pusan to Lianyungang 2days sailing schedule. directing. Inchon to Lianyungang 24hours sailing schedule directing. Also supply: West America to Lianyungang . Southeast Asia to Lianyungang . Dubai to Lianyungang. Service Router

  23. Agenda • Company Profile • The First Eurasia Continental Bridge Railway Transport Profile • The New Bridge Transportation Introduction • Successfully operated auto transportation cases • Service Router • contact detail

  24. Principal: Zheng YaAssisant General Manager TEL:86-0518-82324742 MP: 13961391833 E-mail: zhengya@cslyg.com He Bingye TEL: 86-0518-82320404 MP: 15861219828 E-mail: heby@cslyg.com Kang Qian TEL: 86-0518-82231085 MP: 13655136945 E-mail: kangqian@cslyg.com Contact Detail • OP: • Sheng Xueyang • TEL: 86-0518-82231377 • MP: 13905139150 • E-mail: saint@cslyg.com • Li Qingwei • TEL: 86-0518-82231085 • MP: 13812346601 • E-mail: cylqw@cslyg.com

  25. Sincere Collaboration with you for win-win outcome

  26. Thank you!

More Related