An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Firestone Building Products EPDM Training – Base Tie-in and Roof Edge

  2. Details: Base Tie-In – RPF Strip, 2” plates to deck

  3. Details: Base Tie-In – RPF Strip, 2” plates to wall.

  4. Details: Base Tie-In – RPF Strip, Batten to deck

  5. Details: Base Tie-In – RPF Strip, Batten to wall.

  6. Details: Base Tie-In – 2” plates

  7. Details: Base Tie-In – 2” plates to wall/curb

  8. Details: Base Tie-In Improper Application

  9. Details: Base Tie-In Proper Application

  10. Base Tie-In Tips • Base tie-in should have the proper fastening rate per roof design. • Base tie-ins can be made to either the deck or into the approved adjacent vertical surface. • Do not over-drive plates and fasteners. • Be sure to prime all mating surfaces within the base tie-in. • Use caution when rolling in the base tie-in areas. • If a deck obstruction occurs, base tie-ins can be moved a maximum of 6” from the wall or parapet.

  11. Details: Roof Edge Corner w/ T-Joint

  12. Details: Roof Edge w/ QS endlap splice overlap

  13. Details: Roof Edge w/ Field Seam

  14. Details: Roof Edge w/ Field Seam Missing T-Joint Cover

  15. Details: Roof Edge w/ Field Seam Missing T-Joint Cover

  16. Details: Roof Edge Splice

  17. Details: Roof Edge Metal Splice

  18. Roof Edge Tips • Wood nailers must be installed to meet applicable building codes or 200lbs per linear foot minimum in any given direction. • Metal flanges must be fully supported by wood and terminated at least ½” from the edge of the wood. • Metal flanges covering the wood nailer must be fastened every 4” o.c. • Lap sealant is required on the entire upslop edge of the QuickSeam Flashing. • When stripping in the edge with 5” QuickSeam Flashing be sure to center the edge metal nails underneath the flashing.