An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Retaining Staff through Service RedesignPresenter: Vicki Durston, Cheyne Chalmers, Lynne BickerstaffHospital: Southern HealthVicki DurstonEmail: vicki.durston@southernhealth.org.auPhone: 03 95946161Mobile: 0407531924Acknowledgments: Caron Hill & Felice Borghmanns

  2. Key Problem: Acute Ambulatory Services (2007) needed to be responsive to meet the needs of SH and the service users: • improve access to services • divert and substitute care to relieve hospital demand • adopt universal approaches maximising efficiency, workforce flexibility and transfer of resources • provide models of care that reflected the needs of the client and SH

  3. Aims of this project: Phase 1 • To improve governance in patient care • Retain staff through service redesign • Implement a career structure • Implement new models of care Phase 2 • Reduce reliance on brokerage by converting dollars spent to EFT

  4. Key Changes Implemented: Phase 1 Implementation of a comprehensive career structure • Introduction of Grade 2 RN nurses into HITH • Introduction of a Clinical Educator • Introduction of CNS’s and CNC into the service • Introduction of a Grade 4A • Two new bundles of care: Cellulitis and Anti-coagulation Phase 2 Cost benefit analysis of brokerage to EFT conducted Project plan to be developed September 2009 .

  5. Acute Ambulatory Care team – Southern Health 2009

  6. Outcomes so far: Pre and Post Cultural Survey of staff

  7. Outcomes so far: Patient Care The hospital’s utilising the new HITH medical model. This has had significant reductions in LOS for cellulitis, patients

  8. LESSONS LEARNT • Essential to have vision and leadership • Stakeholder engagement • Invest in team development • Be values based • Celebrate success • Be prepared to influence ( industrial )