An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Imagery for the NationCost Benefit Analysis NDOP October 26, 2006

  2. IFTN CBA • Purpose: Develop a comprehensive business case that accurately communicates program goals, objectives, costs and benefits. • Funded by USGS and FSA • FSA contract vehicle • Perot Systems – Fairfax VA (Plano TX HQ)

  3. Scope • Development of comprehensive report (metrics, costs, benefits) • Determine distribution of benefits among stakeholder groups, calculate accrual rate of expected benefits • Verify cost assumptions • Assess risks • Conform to Federal Capital Planning/CPIC Guidance

  4. Tasks • Design Methodology – Nov. 15 • Conduct Analysis – March 16 • Identify alternatives • Conduct research and benchmarking • Analyze data (tangible/intangible benefits, impacts, benefits, risk factors) • Estimate Costs/Benefits • Develop report – June 15

  5. Contract Kick-OffOctober 11, 2006 • COTR • Jim Heald, FSA • Lead Technical POCs • Shirley Hall, FSA • Jim Mauck, USGS • Participants • George Lee, Dave Roberts – USGS • Bill Burgess, Ted Koch - NSGIC

  6. Issues • Increasing area of 1 ft. coverage – changing requirements • Ensuring that people, resources, and information is available to Perot Systems • Capturing all stakeholder requirements, benefits