1 / 19

MINISTRY OF DEVELOPMENT TURKEY

This presentation highlights the main goal of developing working and living conditions in rural areas, with a focus on rural industries. It discusses policy documents, a decentralized approach to infrastructure building, and the general situation of rural development in Turkey.

Download Presentation

MINISTRY OF DEVELOPMENT TURKEY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MINISTRY OF DEVELOPMENT TURKEY JANUARY 2015 www.kalkinma.gov.tr

  2. RURAL DEVELOPMENT – RURAL INDUSTRIES CONTENTS OF PRESENTATION 1- Overview 2- Main goal 3- Policydocuments 4- An alternativeapproachtoruralinfrastructure 5- Ruralindustries

  3. GENERAL SITUATION 34,000 villages 47,000 sub-villages Total:81,000 settlements 11.8 million people Relativelypoorandless-educated

  4. MAIN GOAL Developrural society’s working and living conditions Improvequality of life in rural areas - reachcountry averages

  5. MAJOR AXES NATIONAL RURAL DEVELOPMENT STRATEGY (2014-2020)

  6. DECENTRALIZED APPROACH TO INFRASTRUCTURE BUILDING • Components • Drinking water • Roads • Small scale irrigation and sewerage

  7. District-based annual programming by local authorities(Special ProvincialAdministrations/Village Service Unions)

  8. Total fundingallocated for 2005-2014 • 9,2 billion TL (3.25 billion €)

  9. Drinking waterprojects: 51.405 • Safe access to water (bysettlements): • 2005-93% • 2014-99% • Road (km) • Constructed: 193.993 km • Repaired: 38.901 km • Irrigation (agricultural land – ha): 61.066

  10. ORGANIZED INDUSTRIAL ZONES andSMALL INDUSTRIAL SITES

  11. GENERAL INCENTIVES SYSTEM Steadilyincreasinglevels of taxcutsandothersupports 6 classes of provinces Socio-economiccompositeindex (Principalcomponentanalysis) Lesson: Works bestforlowerlevelprovincesif (!) physicallyclosetotraditionalindustrialcenters

  12. AGRICULTURE BASED INDUSTRIAL GRANTS

  13. Infrastructure matters Industry should be allowed to self-organize at times General incentives work best for lower level provinces if (!) physically close to traditional industrial centers Project based cash grants are sometimes the only way LESSONS

  14. Thank you... ibrahim.kuzu@kalkınma.gov.tr ibrahimkuzu@post.harvard.edu www.kalkinma.gov.tr

More Related