1 / 20

UAE UNIVERSITY College of Engineering Training and Graduation Project Unit Electrical Engineering Dept.

UAE UNIVERSITY College of Engineering Training and Graduation Project Unit Electrical Engineering Dept. Development and Implementation of a SCADA System for The Power System Simulator Faculty Advisor: Dr. Naser Abdel Rahim Group Members: Abdullah Qadri 980711183

vladimir
Download Presentation

UAE UNIVERSITY College of Engineering Training and Graduation Project Unit Electrical Engineering Dept.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UAE UNIVERSITYCollege of EngineeringTraining and Graduation Project UnitElectrical Engineering Dept. Development and Implementation of a SCADA System for The Power System Simulator FacultyAdvisor: Dr. Naser Abdel Rahim Group Members: Abdullah Qadri 980711183 Hamam Abdel Magid 980215148 Ramsey Selim 980711398 Mohammed Hassan 199901548

  2. Contents • Gantt chart. • What is the SCADA System. • Power System Simulator (PSS). • Remote Terminal Unit. • ISaGRAF. • Relays and Connections. • Cost Estimate. • Impact and Conclusion. • Demonstration.

  3. Project Objective To develop and implement a SCADA system to actuate some of the features of a power system simulator (PSS) and monitor most of its states.

  4. The Idea of The Project

  5. SCADA System • SCADA (Supervision Control and Data Aquisistion) is the general term for a large group of computer systems with special capabilities • Typically, it is used in industrial applications to control and supervise processes in real-time • In this project, it is used to control and supervise the generation, transmission and distribution of energy in the PSS

  6. Gantt Chart

  7. Term Objective • Completely understand the P.S.S setup. • Gain Programming Skills in : • SCADA • ISaGRAF • Set a budget for the project. • Simulate and implement the Generator section of the P.S.S

  8. The PSS

  9. P.S.S Circuitry

  10. P.S.S Aims • System analysis. • Set Control points. • Transducers to be used.

  11. Remote Terminal Unit

  12. RTU (Remote Terminal Unit) • Digital Electronic Device with the following three criteria • It has a programmable memory, to store instructions • Implements various functions such as: logic, sequencing, timing, counting and arithmetic functions • The various functions are used to control machines or processes

  13. Components of The RTU • Hardware • Digital inputs and outputs • Analog inputs and outputs • Communication Ports • Software • ISaGRAF • Function Block Diagram (FBD)

  14. Design Progress • Previously Achieved • P.S.S Analysis • ISaGRAF Workshop • DNP Workshop • AC Motor Control • Recently Achieved • Control points were located • Appropriate sensors and relays were chosen • Schematics of the P.S.S to RTU connections

  15. …Design Progress Control Points Sample:

  16. … Design Progress

  17. CostEstimate

  18. Project Approach • Understand the operation and the structure of the PSS • Understand the operation of the SCADA system • Define the points of control and supervisory • Choose the necessary equipments • Design and implement the automatic control system: • Install the needed equipments in the PSS • Program the RTU using the ISaGRAF program • Program the main computer using CITECT • Software and Hardware Development to satisfy project objectives.

  19. Achievements • Current Achievements • 3 sections of the P.S.S (Literature Review) • Set control points • Relevant sensors were specified • Planned Achievements • Feasibility study. • Motor control using ISaGRAF

  20. Impact • EE Students Learning (Computer Interface instead of manual control) • This Project offers the students the opportunity for hands-on experience in the widely spread technology (SCADA).