An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation of the The ARC System Construction Cost Control “Click” mouse to advance presentation Version 2.2 January 2003

  2. What is the ARC System? • Site construction cost control & management software • Designed for the telecommunications industry • Based on a comprehensive “shopping list” of construction items (Master Schedule of Works with agreed rates) • User–friendly means of managing the Schedule of Agreed Construction Rates • Uses well-defined model sites to set accurate site construction budgets & produce cost control documents • Used by Designers & Contractors to produce site cost control documentation from Estimate (financial planning) to Final Account

  3. What are the Benefits? • Visibility of ‘REAL’ construction costs and excessive costs for sites, early in the rollout process • Consistent and clear cost information from Contractors • Simple method of producing / processing cost documentation & contractor payments • Contractors judged on time and quality not on COST • Client can use the costs to determine future budgets • Ensures appropriate ‘paper trail’ for Quality Assurance

  4. How does the ARC work? In brief, the ARC System involves two phases of work and different versions: • CLIENT VERSION • Utilised for the set up of the software in accordance with the Customer requirements including a Master Schedule of Works & Model Sites - Phase 1 • Following set-up the software can be utilised by the Client to import / create / manage cost control documentation – Phase 2 • PARTNER VERSIONS • Utilised by Design Consultants and Contractors to create construction cost control documentation based on an agreed set of rates and model sites – Phase 2

  5. Phase 1 - Initialisation / Set-up With the assistance of FocusPlus SA, the ARC System is customised to the Client requirements Modifying the Master Schedule of Works to suit the Client’s & project needs Setting Client and project parameters Entering project Designers and Contractor details Importing & analysing Contractor post tender rates based on the schedule of line items Setting & fixing the final rates for each Contractor Defining & importing model sites that are appropriate to the project Generating Designer & Contractor partner versions for creation of cost control documents based on fixed rates

  6. Phase 1-Master Schedule of Works The FocusPlus Master Schedule of Works is Structured as follows: • Schedule divided into SECTIONS • Sections divided into CATEGORIES • Categories contain SUB CATEGORIES or line items of construction activity Note: Alternatively a Client may utilise their own schedule of works, however, modifications to the schedule may be necessary to ensure compatability with the ARCsoftware.

  7. Phase 1-Master Schedule of Works The FocusPlus SA schedule can be modified or a Client schedule can be imported into the ARC Support statements provide descriptions of the line items to assist in pricing & schedule management Line Items can be added to or deleted from the schedule Sections, Categories & construction line items can be easily located by the tree structure

  8. Phase 1-Rate Agreement The finalised project Schedule of Works is Priced by the Contractors & the rate for each line item is imported into the ARC system. The ARC is utilised to analyse Contractor rates for different scenarios (e.g. National vs Regional). The ARC will produce a spreadsheet which compares the rates submitted by the Contractors. The ARC can compare the rates of any number of different Contractors Rates are negotiated and agreed with the Contractors, then fixed by the ARC The ARC provides a visual comparison based on percentage variation from the mean value. The percentage variation can be modified to suit.

  9. Phase 1-Project Model Sites Model sites are defined with the Client that represent the typical sites to be constructed on the project. Model site schedules are imported into the ARC system. • The function of model sites is as follows: • Utilised by the Client to establish construction budgets based on negotiated rates • Selection of an appropriate model site schedule as the basis for the cost control document creation • As a cost cross comparison budget vs live site construction costs

  10. Phase 1-Typical Model Sites Model sites are defined that suit the project and territory. Typical models sites currently available are indicated below:

  11. Phase 1-Partner Version Creation The CLIENT VERSION is utilised to generate PARTNER VERSIONS of the software for distribution as follows: The ARC Design Consultant Partner Version incorporates fixed rate types for the range of Contractors and/or Regions for which they will work • The ARC Contractors Partner Version incorporates fixed • rates for one of the following rate types: • National rate basis for all project Contractors • Regional rate basis for each Contractor within a region • Specific Contractor ratebasis (Set of fixed rates for each Contractor)

  12. Entry Screens for Different Versions Administrator access only

  13. Phase 2-Cost Control Documents The ARC System manipulates the Master Schedule of Works to efficiently create various cost documents for each Site, as indicated below: Build Cost Estimate Bill of Quantities The above documents are typically prepared by a Design Consultant Fixed Price Quotation Certificate of Payment Variation Orders Final Account The above documents are typically prepared by a Contractor Note: The application can be utilised to produce all or a selection of the above documents for each site type.

  14. Phase 2-Cost Control Documents Cost Control Document output is dependant on the ARC Version utilised, as indicated below:

  15. Phase 2-Cost Control Documents Each document type is issued during the following phases:

  16. Phase 2-Cost Document Creation Accessing site cost information or entering new site details: Enter the site details e.g Site ID, site name, address site type etc. Enter the site reference and candidate Create a document List of sites in the database The above screens are used to access site details and documents already in the database and for entering new site details

  17. Phase 2-Cost Document Creation Select the document type and other parameters: Import quantities from a document previously created by another ARC user Site details Saved Documents Choose a document type: Build Cost Estimate Bill of Quantities Contractors Fixed Price Quotation Contractors Certificate for Payment Contractors Variation Order Contractors Final Account Document version control View the contents of a document Creation of document based on: A Model Site Previously created document (same type) Document version from another Site Manually from the Master Schedule Imported document prepared by another user Print a report Choose the rate basis: National Regional Contractor (OR Zero rate) Create a document Export a created document

  18. Phase 2-Cost Document Creation Creating a cost control document (e.g. Build Cost Estimate) Select the name of the user pereparing the document Site details Itemsof work which are Not Included in the Master Schedule of Works can be entered manually Delete line items as necessary Unit rates CANNOT be altered by the end user Add new line items From the Master Schedule of Works library Documents based on model sites are substantially complete with only minor modifications necessary Alter quantities as necessary Group statement

  19. Phase 2-Cost Document Creation Creating a Contractor’s Certificate for Payment Purchase order value Select the name of the user pereparing the document Site details Manually enter the gross amount figure Contractors name must be selected Total of variation orders issued to date entered automatically Save modifications prior leaving the screen Less amount paid out in the previous payment certificate entered automatically The report can be previewed and printed from this screen Net amount due in the current certificate Enter retention precentage if applicable

  20. Phase 2-Cost Document Creation Creating a Contractor’s Final Account Select the name of the user pereparing the document Site details Contractors name must be selected Save modifocations prior to leaving the screen Contractors final account is based on the fixed price quotation plus any variation orders issued during the construction phase The report can be previewed and printed from this screen Total of variation orders Total final account

  21. Phase 2-Cost Document Creation Creating a Contractor’s Variation Order Enter manually items of work which are Not Included in the Master Schedule of Works Select Sub Categories from the Master Schedule of Works to be included in the Variation Order Entering a negative quantity will change the item to a negative amount and turn the line RED

  22. The ARC System by FocusPlus SA