The Proton Source

The Proton Source. Activities: Deliver reliable beam to the entire complex Work to reduce beam losses, which currently limit the total flux to the neutrino experiments. Address reliability concerns, under the assumption that the existing source will have to operate for ~10 more years. Booster.

vsouza
Download Presentation

The Proton Source

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Proton Source • Activities: • Deliver reliable beam to the entire complex • Work to reduce beam losses, which currently limit the total flux to the neutrino experiments. • Address reliability concerns, under the assumption that the existing source will have to operate for ~10 more years. Booster 400 MeV “DMZ” Linac Operational Review, March 17, 2004 - Prebys

  2. Jumping on the Restructuring Bandwagon… Proton Source Department New • New group. Responsibilies: • Coordinate modeling and studies • Address global issues Operational Review, March 17, 2004 - Prebys

  3. Some Specific Issues • Near Term • Linac/400 Mev Line Instrumentation and Characterization • Booster Lattice Optimization • Collimator Commissioning • Beam Cogging for pbar production • Alignment!!!!! • This year: • Complete lattice work (Long 13 dogleg) • Upgrade ORBUMP and power supply • Install prototype RF cavities as 19th and 20th (???) • Longer term (proton plan): • Upgrade RF system (cavities and/or distributed amps) • New corrector system (trims+multipoles): • 30 Hz Harmonic to Booster ramp ??? • Lots of maintenance projects Operational Review, March 17, 2004 - Prebys

  4. Effort Snapshot Operational Review, March 17, 2004 - Prebys