1 / 4

Current test set-up

Current test set-up. Access VME with SBS620 PCI-VME link. Throttle signals from FED to FT. FT (slave). Clock & L1As from FT to FED. FT (slave). FT (slave). PC with PCI-X slots. FT (master). J1 Connector. J2 Connector. Simulate Local Trigger Control System.

waldo
Download Presentation

Current test set-up

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current test set-up Access VME with SBS620 PCI-VME link Throttle signals from FED to FT FT (slave) Clock & L1As from FT to FED FT (slave) FT (slave) PC with PCI-X slots FT (master) J1 Connector J2 Connector Simulate Local Trigger Control System Merge 96 fibres into 8 ribbons of 12 fibres SBS VME-PCI Card J0 Connector Generic PCI Card Slink-Tx Slink Rx LVDS cable FED LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles

  2. TTC System Version 1 TTC Optical Distribution Clk Clk TTCvi TTCex FT Master Trigger Control System FED L1A Chan A Attenuation or fan-out BC0 3xBGo Chan B FED L1Reset Pipe Valid FED FED FT Slave FT can drive 4 NIM/ECL channels Do we need it to drive more? What about: - Event Counter Reset - Orbit Counter Reset TTCvi has 4xBGo + 1xL1A inputs FED FT Slave Clk and Control FED FT Slave FED FT Slave LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles

  3. TTC System Version 2 Clk TTC Optical Distribution Clk TTCvi TTCex FT Master Trigger Control System FED L1A Chan A Attenuation or fan-out BC0 2xBGo Chan B FED L1Reset FED Difference compared with TTC v1 FT clk supplied by TTCex TTCvi clk supplied by FT Only drive 2 BGo inputs. What about - Event Counter Reset - Orbit Counter Reset - Pipe Valid FED FT Slave FED FT Slave Clk and Control FED FT Slave FED FT Slave LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles

  4. Status & Plans • Done • James has written TTCvi software interface • FT firmware upgraded • New daughter card design complete • Pending • Workshop to layout and manufacture daughter card. At least another week before we get it back. A problem ? LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles

More Related