An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 0291 – NTS Licence Special Condition 27 – Balancing Arrangements Transmission Workstream 6th May 2010

  2. Contents • Background • Introduction to Review Group 0291 • Next Steps

  3. Background to Review Group 0291 • History • Development of a Linepack product has been muted previously as a means of valuing the flexibility within the pipeline • Current SMP Buy & Sell fixed differentials originally implemented in 2001 as a ‘short term’ solution in lieu of an ‘enduring’ solution • NTS Licence Standard Condition 27 • Introduced during recent SO incentive consultation to direct National Grid to develop / update the above

  4. Review Group 0291 • National Grid does not know the answer to the Linepack & Cashout ‘challenge’ • Review Group will provide a combined forum for the industry to; • Develop possible solutions • Analyse options, and • Recommend approach in response to Licence

  5. Next Steps • Review Group to run May – September 2010 • All industry parties encouraged to join (see upcoming JO invite ) • Final Report to UNC Panel (Sept) • Cashout • Modification Proposals (Oct) • Consultation (Nov) • Panel Consideration (Dec) • Ofgem Decision (Jan) • Implementation – 1st April 2011 • Linepack • Develop potential product 1st April 2011 • Implementation (if directed by Ofgem) 1st October 2011