An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prepared by ISS Consulting (Thailand) MILLCON STEEL PLC ConceptualBusiness Blueprint 27 August 2019

  2. 1 2 3 4 ORGANIZATION STRUCTURE MASTER DATA and KEY DATA STRUCTURE • BUSINESS PROCESS • SCENARIO LIST DEVELOPMENT LIST

  3. 1 ORGANIZATION STRUCTURE

  4. Organization Structure in Materials Management Company Code 3000 Millcon Steel Pipe Co.,Ltd. 4000 MillconSteel Bar Co.,Ltd. 2000 Millcon BurapaCo.,Ltd. 1000 Millcon Steel Public Co.,Ltd. Plant 1100 Millcon Steel (Rama 2) 3100 Millcon Steel Pipe (Rama 2) 2100 Millcon Burapa (Rayong) 4100 Millcon Steel Bar (Rayong) 1200 Millcon Steel (Rayong) 4200 Millcon Steel Bar (Rama 2) Storage Location 1101 Scrap Yard 1101 Coil 1101 Billet Yard 1101 Billet Yard 1201 Production Line 1201 Production Line 1201 Melt Shop Line 1201 Production Pipe 1301 WH Zone 1 1301 WH C02-C04 1301 WH Zone 1 1301 WH - Pipe 2101 Billet Yard 2101 Billet Yard 2201 Production Line 2201 Production Line 2301 WH C02-C04 2301 WH Zone 1

  5. Organization Structure in Materials ManagementStorage Location: Plant 4100

  6. Organization Structure in Materials ManagementStorage Location: Plant 4100- Cont.

  7. Organization Structure in Materials ManagementStorage Location: Plant 4200

  8. Organization Structure in Materials ManagementStorage Location: Plant 4200 - Cont.

  9. Organization Structure in Materials Management Plant 1100 Millcon Steel (Rama 2) 3100 Millcon Steel Pipe (Rama 2) 2100 Millcon Burapa (Rayong) 4100 Millcon Steel Bar (Rayong) 1200 Millcon Steel (Rayong) 4200 Millcon Steel Bar (Rama 2) Purchasing Org. 1000 Millcon Purchasing Purchasing Group 141 IM-Consumable 111Import - RM 211LC-Raw Mat 235 LC-Spare Part OPER 112IM-Raw Mat Sub Raw 212LC-Raw Mat Sub 236 LC-Spare Part OTH 151IM-Project 121IM-Trading 213LC/IM spare part 241 LC-Consumable 161IM-Service ELEC 131 IM-Spare Part JV 214 LC-Scrap 162IM-Service MECH&UT 251 LC-Project 261 LC-Service ELEC 132 IM-Spare Part ELEC 221 LC-Trading 163 IM-Service PROD 262 LC-Service MECH&UT 133 IM-Spare Part MECH 222 LC-Trading KMS 164 IM-Service OTH 263 LC-Service PROD 134 IM-Spare Part SUB 231 LC-Spare Part JV 181 IM-TOOL 264 LC-Service OTH 232 LC-Spare Part ELEC 191 IM-Other 281 LC-TOOL 233LC-Spare Part MECH Import 291 LC-Other 234 LC-Spare Part SUB Local 292 LC-Asset for Off.

  10. 2 MASTER DATA and KEY DATA STRUCTURE

  11. Master Data Structure in Material ManagementMaterial Type Price Control V = Moving Average, S = Standard Cost Valuation Category X = Value by Batch N = New R = Refurbish

  12. Key Data Structure in Material ManagementPurchase Requisition (PR)

  13. Key Data Structure in Material ManagementRequest for Quotation (RFQ)

  14. Key Data Structure in Material ManagementContract

  15. Key Data Structure in Material ManagementPurchase Order (PO)

  16. Key Data Structure in Material ManagementPurchase Order (PO) - Cont.

  17. Key Data Structure in Material ManagementRelease Strategy

  18. 3 • BUSINESS PROCESS SCENARIO LIST

  19. Business Process Scenario List Purchasing Process

  20. Business Process Scenario List Inventory Process

  21. 4 • Development List

  22. Development List

  23. Development List - Cont.

  24. Question & Answer

  25. Thank You