Objective FCM04. ESSIP Plan 2014. Octavian CIOARA DPS/PEPR 19.09.2014. Objective FCM04. Comprehensive Explanation What is new or has changed since LSSIP 2013 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2013
E N D
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR 19.09.2014
Objective FCM04 • Comprehensive Explanation • What is new or has changed since LSSIP 2013 • Link to European ATM Master Plan • Finalisation Criteria and Closed Questions • ESSIP Report 2013 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Links and contacts ESSIP Plan 2014 / Objective FCM04
Comprehensive Explanation • Area of applicability: France, Germany, Italy, Poland, Spain, Switzerland • Applicable to: Paris, Bordeaux, Marseille, Brest, Karlsruhe, Roma, Warsaw, Madrid, Barcelona, Geneva and Zurich FMP • Initial Operational Capability (IOC): 09/2013Full Operational Capability (FOC): 12/2015 • The objective will ensure the deployment of Short Term ATFCM Measures – Phase 1 (as defined by the Interim Deployment Programme – IDP) • As deployed in London, Raims and Maastricht FMP • A more automated version of STAM (labeled STAM phase 2) will be released in the next years by SESAR – Not within the scope of FCM04! ESSIP Plan 2014 / Overview LSSIP 2013
What is new or has changed since LSSIP 2013 • Nothing. ESSIP Plan 2014 / Overview LSSIP 2013
Link to European ATM Master Plan Objective FCM04 covers the following SESAR OI steps: • OI step - [DCB-0205] – Short Term ATFCM Measures ESSIP Plan 2014 / Overview LSSIP 2013
Most important SLoA(s) • FCM04-ASP01 – Availability of demand-capacity balancing tools via CHMI (finalisation date 12/2015) • FCM04-ASP02 – Provision of ANSPs sector and traffic occupancy parameters data to NM (finalisation date 12/2015) • FCM04-ASP03 – Implement FCM procedures to enable application of flow management techniques on traffic streams closer to real-time and including more accurate assessment of forecast sector loads and cooperative management of groups of sectors and ATCO resources (finalisation date 12/2015) ESSIP Plan 2014 / Overview LSSIP 2013
Finalisation Criteria and Closed Questions Finalisation criteria: • Contact your subject matter expert to determine the deployment Status for each SloA Closed questions: • Closed Questions have been introduced for this Objective • Statements on Deployment Status should provide answersto Closed Questions ESSIP Plan 2014 / Overview LSSIP 2013
ESSIP Report 2013 • The submitted reports indicate that the objective will be implemented in time by the States within its area of applicability. However there is still a need for the clarification of implementation intention of States which have reported -No Plan- despite being in the applicability area of the objective. • It is also desirable to capture the plans for the States which are not formally with the applicability area but which have expressed interest for the implementation of STAM Phase 1 through other channels, in order to have a better view of the progress. ESSIP Plan 2014 / Overview LSSIP 2013
Objective Coordinator’s Analysis, recommendations, tips & tricks • Ensure that your subject matter expert is involvement once you make your statement. • Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material. • Attention to the applicability to the Military stakeholders as airspace users. ESSIP Plan 2014 / Overview LSSIP 2013
Links and contacts Objective Coordinator: Octavian CIOARA +32 2 729 3282 octavian.cioara@eurocontrol.int NMD Objective Expert: Marcel RICHARD +32 2 729 9857 marcel.richard@eurocontrol.int ESSIP Plan 2014 / Overview LSSIP 2013