Production Preparation Process

Production Preparation Process. The SMS Technologies Quality Management System includes: ISO 9001, AS9100, ISO 13485, and ISO/TS 16949 They All Include Product Realization Advanced Product Quality Planning Production Preparation Process Production Part Approval process.

wardah
Download Presentation

Production Preparation Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Preparation Process • The SMS Technologies Quality Management System includes: • ISO 9001, AS9100, ISO 13485, and ISO/TS 16949 • They All Include Product Realization • Advanced Product Quality Planning • Production Preparation Process • Production Part Approval process

  2. APQP, Flow Charting, Process FMEA, Control Plan, 3-P & PPAP • APQP = Advanced Product Quality Planning • Build 1st-time Quality into the Production Process • FMEA = Failure Mode Effects Analysis • Minimize Risk (DFM, DFT & Mistake-Proofing) • 3-P = Production Preparation Process • Build to Customer Demand Beginning at Launch • PPAP = Production Part Approval Process

  3. PRODUCT QUALITY PLANNING TIMING CHART CONCEPT INITIATION/ APPROVAL PROGRAM APPROVAL PROTOTYPE PILOT LAUNCH PLANNING PLANNING PRODUCT DESIGN AND DEV. PROCESS DESIGN AND DEVELOPMENT PRODUCT & PROCESS VALIDATION PRODUCTION FEEDBACK ASSESSMENT AND CORRECTIVE ACTION Planning INPUTS | Planning OUTPUTS Product Design & Dev. INPUTS | Product Design & Dev. OUTPUTS Process Design & Dev. INPUTS | Process Design & Dev. OUTPUTS Product & Process Validation INPUTS | Product & Process Validation OUTPUTS Production INPUTS | Production OUTPUTS

  4. SEI Process Flow Diagram

  5. Process Failure Mode Effects Analysis

  6. Proto-type, Pre-launch & Production Control Plans

  7. Operator Work Instructions Work Instructions with applicable drawings, etc. are developed for each material transformation:

  8. The Key Linkages for Customer Special Characteristics Process Flow Chart FMEAs Control Plans Operator Instructions PPAP Core Tools Applications

  9. Defining & Balancing The Cell

  10. Calculating Takt Time Total Shift Hours = 8 X 60 min. X 60 sec. = 28,800 seconds -2 - 15-minute breaks X 30 min. X 60 sec. = 1,800 seconds -Start-up & Shut-down = 15 min. X 60 sec. = 900 seconds Available Work Time = 26,100 seconds Takt Time = Available Work Time / Customer Demand (units) TAKT TIME = 26,100 Seconds / 50 Units = 522 Seconds TAKT TIME = 522 Seconds / 60 = 8.7 Minutes Build a cell that will produce one unit every 8.7 minutes!

  11. Defining & Balancing The Cell

  12. Defining & Balancing The Cell Until learning curves been achieved, work portions are allowed to vary slightly around the takt time until conducting further studies:

  13. Preliminary SEI Cell Floor Layout

  14. Varying The Cell Volume Scaling Volume by Adding Shifts