An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTF Project UpdatesJune 1, 2011

  2. RTF Project Updates • SEEM Workshop • Held May 2 and May 31 in Portland • 21 attended May 2, • Request for additional training; Authorization to spend additional funds on more workshop(s)? • BPA M & V Methodology • Scheduled for June 28th RTF • RTF Operations Subcommittee (5/13) • Established meeting minute review procedure • Reviewed and advised June 1 Agenda • Discussed process for GrocerSmart 4 • Determined schedule for Guidelines

  3. RTF Project Updates • Domestic Heating Fuel Choice Study • No follow up meeting since May RTF • Northwest Research Group • Met 4 May 2011 @ NEEA • Presented and discussed Guidelines • Discussed and proposed Evaluation Calendar update • Follow up meeting with NEEA 24 May 2011 • GSHP Measures (ASHP to GSHP; FAF to GSHP) • Addition of a base case electric forced air • Finalizing the installation specification • No meeting of sub-committee expected

  4. RTF Project Updates • “Montana House” • Schedule Update • GrocerSmart4 • Subcommittee met three times • Identified what Protocols required for RTF Consideration • Determining sample sizes for Evaluation Plan • Identifying utility funding partners

  5. RTF Project Updates • Variable Capacity Heat Pump • Standard Protocol for Fan VFD • RTUG • Review Proposal for 28 June RTF Meeting • Measure Review and Cost/Life Guidelines • Schedule