An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Support for Local AuthoritiesNeil MarshallChief Executive

  2. Who we are • Represent manufacturers and installers • CWI, EWI, IWI, Hybrid • Loft/Roof Insulation • Draught Proofing/Air Leakage • 170 members - GB and NI • Full service TA • Promote the benefits of insulation • Range of membership services • Industry representation • Work in partnership with like minded organisations • Maintain Standards • Membership criteria, • Code of Professional Practice

  3. NIA/SWIGA SWI Industry Framework and Guarantee

  4. The Opportunity for SWI • Around 7m homes with solid walls • 2.3m by 2022 to hit Climate Change Targets • C. 10 fold increase in industry capacity • Key area of focus in the Green Deal and ECO • Social housing will have key role in early stages

  5. The European Market: External Wall Insulation

  6. The Challenge • Provide cross stakeholder confidence • Rapid expansion of EWI/IWI industry capacity whilst maintaining quality and standards • Ensure robust technical solutions and quality installations to deliver in situ savings • Provide consumer reassurance and protection

  7. Potential Obstacles • EWI currently a specialist market • IWI a fragmented market • Fragmented accreditation • Lack of a formal skills and training framework • Lack of a formal surveillance scheme • No robust, cohesive consumer guarantee • Lack of consumer awareness and confidence • Regulatory issues - Planning and Building Regs

  8. NIA/SWIGA Approach • Create a new uniform industry platform/guarantee • EWI, IWI, Hybrid Systems • Utilise new and existing members expertise • Dedicated Project Team to fast track the development • Collaborative/partnership working

  9. NIA Membership • 14 major EWI manufacturers/system designers • 32 EWI Installer companies • 6 major IWI manufacturers • 16 IWI Installer companies

  10. SWI Organisation Stakeholder Review DevelopmentGroup External Wall Internal Wall Marketing PR Project Team NIA/SWIGA

  11. The Framework Quality Assurance: • Training and Skills • Best Practice Guides • Approved Installers • Surveillance Scheme • Robust Standard Solutions Consumer Protection • Guarantee Scheme • Codes of Practice • Arbitration Service

  12. Development of Technical Framework • Review EWI and IWI existing approvals and supply chains • Set proposed minimum standards of accreditation • Develop standard set of robust details • Develop job related supplementary guidance sheets • Devise ownership manual

  13. Skills & Training • 4 Point Plan in conjunction with Construction Skills: • National Occupational Standards • OSAT/ Current Skilled Workers • Retraining – e.g. Cavity Wall Installers • New Entrants/Apprenticeships

  14. Surveillance Scheme • NIA/SWIGA/BBA partnership • Installer Assessment Scheme • Independent Inspection Scheme • Undertake pilots

  15. Pilots • Validate key elements of the framework • Targeting 1,000 properties – representative mix • Based on existing CERT/CESP/LA funded schemes • Wider opportunities • Case studies • Impact on local community • Timeline • Commence Summer 2011 • Evaluation and incorporation of learnings from first Phase Winter 2011 • Completion Autumn 2012

  16. Support Available • Information • www.nationalinsualtionassociation.org.uk • Literature • Communication • NIA Local Forums • CAN Network Meetings • Access to members • Postcode Locator • Issue expressions of interest/tenders • Participation in NIA/SWIGA SWI Pilots