Lake Powell Pipeline Project

Lake Powell Pipeline Project. FERC ILP Schedule Update November 10, 2009. LPP FERC Schedule Update. Agency coordination meetings are being held in November and December to share study data and results

wenda
Download Presentation

Lake Powell Pipeline Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lake Powell Pipeline Project FERC ILP Schedule Update November 10, 2009

  2. LPP FERC Schedule Update • Agency coordination meetings are being held in November and December to share study data and results • Draft technical reports completed in November and early December and shared with agencies/tribes for review and comment • Comments incorporated in mid-January 2010 • Initial study report(s) filed with FERC on 1/21/10 • Initial study report(s) meeting on 2/5/10 • Initial study report(s) meeting summary filed with FERC on 2/20/10

  3. LPP FERC Schedule Update (cont.) • Stakeholder comments on Initial Study Reports Study Plan Disputes, and Request to Modify Study Plans due to FERC by 3/22/10 • Stakeholder Responses on Study Plan Disputes and Stakeholder Responses on Study Plan Modification Requests due to FERC by 4/21/10 • FERC issues Director’s Study Plan Determination on 5/21/10

  4. LPP FERC Schedule Update (cont.) • If Second Year Studies not required by FERC, then file Preliminary Licensing Proposal with FERC on 6/24/10 • (If Second Year Studies required by FERC, continue completing studies) • FERC issues comments on Preliminary Licensing Proposal on 9/20/10 • UBWR files License Application on 11/22/10 • FERC begins to prepare Draft EIS and process License Application