1 / 23

System z Linux Proof Of Concept Project Management Best Practices September 8, 2009

Learn best practices for managing a Linux proof of concept (POC) project, including planning, project methodology, and do's and don'ts throughout the project life cycle.

wgonzalez
Download Presentation

System z Linux Proof Of Concept Project Management Best Practices September 8, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. System z Linux Proof Of Concept Project Management Best Practices September 8, 2009 Marianne Eggett System z Linux Practice Manager Marianne.eggett@mainline.com

  2. Agenda • Mainline’s System z Linux Life Cycle • Planning for the POC • Project Methodology Overview • Do’s and Don’ts

  3. Through Out the Life Cycle Mainline is there Proving Planning • System z Linux POC Projects • Systems Assurance • Architecting Solutions • Installation Services • IBM Specialty Engine Loaner • Program • Business Cases • Sizing Servers for IFLs • Value of Z Linux Presentations • Account Planning • Proposal Development • Scoping POC • Linux LOTS • zVM & Linux Healthcheck Production

  4. Years of Experience • 11+ years with Linux • 6+ years implementing Linux on System z • 6+ years server consolidation sizings for System z Linux • 6+ years assisting with business case development • Certifications Novell CLE, CLP, CNS and Red Hat RHCE Linux Team The Team • Planning: New Workload Sales Team • Marianne Eggett – Central, West • Andy Greco – NE, Mid Atlantic, SE • Proving: Installation Team • Project Managers • zVM and Linux Technical Consultants • WebSphere, DB2 UDB, other expertise • Production: 24x7 SuSE LOTS Support Line • Supporting zVM & SuSE Linux • Supporting IBM and many non-IBM middleware Software products

  5. Best Fit For Server Consolidations • DB2 Connect – Ideal 1st Application • Oracle – Generates excellent TCOs • WebSphere AS, MQSeries & Portal • WebSphere HATS & HOD • CICS Gateways, IMS Connect • Lotus Domino eMail and Applications • Tivoli TSM Server • DB2 UDB • Communication Controller for Linux (3745 replacement) • Network Infrastructure; FTP, NFS, DNS, etc. • ISV products; WebFocus, Attachmate

  6. MIS Customer References • State of Idaho Domino, Apache appl • Emigrant Savings WebSphere • University of Maryland Oracle • Thomas Jefferson Un. Hospital TSM • Indianapolis Power & Light WebSphere Hats • Boston University DB2 UDB, Oracle • John Hopkins University WebSphere • Brocade Development Environment

  7. Linux Partners • Novell Business Partnership • Mainline is Novell’s largest remarketer of System z SuSE Linux • Red Hat Business Partnership • IBM • zVM and PPA Software • IBM Software Excel & Support Line • Velocity Software for zVM & Linux performance tuning

  8. Managing the Linux Proof of Concept

  9. Planning Proving – Managing the Linux POC Project Initiation Project Definition • Value Proposition • Learning the value of System z Linux • Server Consolidation • Sizings • Business Case Development • POC Initiative • Scoping POC • POC IFL Sizings • Real memory sizing • Scope Document Installation & Set Up Testing Closing

  10. Value Proposition • IBM • Scorpion Study • Environmental Studies • Application Assessments • zRace Planning Proving • Mainline • IFL Capacity sizings • Business Case • zRace with IBM Techline Production

  11. Planning Proving – Managing the Linux POC Project Initiation Project Definition • Value Proposition • Learning the value of System z Linux • Server Consolidation • Sizings • Business Case Development • POC Initiative • Scoping POC • POC IFL Sizings • Real memory sizing • Scope Document • Infrastructure Planning • Hardware • Software • Network • Security • Disk • Backup & Recovery • Project Planning • Scope Document • Project Plan • Team Roster • Systems Assurance • Statement of Work Consulting Services • Status Report • Phone Support • IBM Loaner Program • POR date • Success Criteria • Configs • Sizings • IBM Contracts • Linux Trial • Software Trial Installation & Set Up Testing Closing

  12. Project Definition • Choosing Scope is Critical • Significant enough • Not overwhelming • Resource Commitment • Senior Management Commitment • Success Criteria • System assurances are valuable

  13. Planning Proving – Managing the Linux POC Project Initiation Project Definition • Value Proposition • Learning the value of System z Linux • Server Consolidation • Sizings • Business Case Development • POC Initiative • Scoping POC • POC IFL Sizings • Real memory sizing • Scope Document • Infrastructure Planning • Hardware • Software • Network • Security • Disk • Backup & Recovery • Project Planning • Scope Document • Project Plan • Team Roster • Systems Assurance • SOW Consulting Svc • Status Report • Phone Support • IBM Loaner Program • POR date • Success Criteria • Configs • Sizings • IBM Contracts • Linux Trial • Software Trial Installation & Set Up • IBM loaner Eq. • zVM & Linux install • Other SW install • Network • Security • Disk • DB loads • Application set up • Other Distributed Servers • Weekly Status Meeting • Status Report Testing Closing

  14. Installation and Set up • Week day vs. Weekend changes • IBM CE • Real Memory • Networks • Consultants on site for skills transfer • Back up environment • Clones • Weekly status meeting

  15. Planning Proving – Managing the Linux POC Project Initiation Project Definition • Value Proposition • Learning the value of System z Linux • Server Consolidation • Sizings • Business Case Development • POC Initiative • Scoping POC • POC IFL Sizings • Real memory sizing • Scope Document • Infrastructure Planning • Hardware • Software • Network • Security • Disk • Backup & Recovery • Project Planning • Scope Document • Project Plan • Team Roster • Systems Assurance • SOW Consulting Svc • Status Report • Phone Support • IBM Loaner Program • POR date • Success Criteria • Configs • Sizings • IBM Contracts • Linux Trial • Software Trial Installation & Set Up • IBM loaner Eq. • zVM & Linux install • Other SW install • Network • Security • Disk • DB loads • Application set up • Other Distributed Servers • Weekly Status Meeting • Status Report Testing • Test Plan • Unit • Volume/Performance • Weekly Status Mtg • Status Report • Issues Management • Escalation Process • Resource Management • In house • Mainline • IBM • Linux vendor • ISVs Closing

  16. Testing • Test Plan • Outline tests • Document performance targets when compared to current production system • Keep track of each run’s changes • Keep track of each run’s results • Learning curve • Ask for help early • Problems • Ask for help early • IBM and BP resources • Open problems with software vendors too, i.e. Oracle • Weekly Status meetings • Schedule meeting out 12 weeks

  17. Planning Proving – Managing the Linux POC Project Initiation Project Definition • Value Proposition • Learning the value of System z Linux • Server Consolidation • Sizings • Business Case Development • POC Initiative • Scoping POC • POC IFL Sizings • Real memory sizing • Scope Document • Infrastructure Planning • Hardware • Software • Network • Security • Disk • Backup & Recovery • Project Planning • Scope Document • Project Plan • Team Roster • Systems Assurance • SOW Consulting Svc • Status Report • Phone Support • IBM Loaner Program • POR date • Success Criteria • Configs • Sizings • IBM Contracts • Linux Trial • Software Trial Installation & Set Up • IBM loaner Eq. • zVM & Linux install • Other SW install • Network • Security • Disk • DB loads • Application set up • Other Distributed Servers • Weekly Status Meeting • Status Report Testing • Test Plan • Unit • Volume/Performance • Weekly Status Mtg • Status Report • Issues Management • Escalation Process • Resource Management • In house • Mainline • IBM • Linux vendor • ISVs Closing • Success Criteria Acceptance • Loaner Purchase or removed • Production Implementation Planning • Purchasing • Technical Services • Vendor 24x7 Support

  18. Closing • Document results against Success Criteria • Review results with project team to gain everyone’s concurrence • Identified lesson’s learned

  19. Proving – Managing the Linux POC Project Initiation 3-5 weeks Project Definition • Value Proposition • Learning the value of System z Linux • Server Consolidation • Sizings • Business Case Development • POC Initiative • Scoping POC • POC IFL Sizings • Real memory sizing • Scope Document 1-3 weeks • Infrastructure Planning • Hardware • Software • Network • Security • Disk • Backup & Recovery • Project Planning • Scope Document • Project Plan • Team Roster • Systems Assurance • SOW Consulting Svc • Status Report • Phone Support • IBM Loaner Program • POR date • Success Criteria • Configs • Sizings • IBM Contracts • Linux Trial • Software Trial Installation & Set Up 2-20+ weeks • IBM loaner Eq. • zVM & Linux install • Other SW install • Network • Security • Disk • DB loads • Application set up • Other Distributed Servers • Weekly Status Meeting • Status Report Testing 1-3 weeks • Test Plan • Unit • Volume/Performance • Weekly Status Mtg • Status Report • Issues Management • Escalation Process • Resource Management • In house • Mainline • IBM • Linux vendor • ISVs Closing • Customer Final Report • Success Criteria Acceptance • IFL Purchased or removed • Production Implementation Planning • Purchasing • Technical Services • Vendor 24x7 Support

  20. Managing the Linux POC Hardware Solution Coordination zVM and Linux POC Project Management Deliverables • These are PMO standard templates to manage Linux POCs • POC Scope Document • POC Success Criteria • POC Project Plan • POC Team Roster • POC Status Report

  21. Beware of the Benchmark POC Final Comments Stay away from performance benchmark tests that drive the IFL to 100% to determine maximum transactions compared to Intel/Power platforms. System z Linux “sweet spot” is as a multi-tasker.

  22. Ideal POC Scope Focus the POC scope on • Learning the environment • Functional test or Production comparative test • Follow up on the Business Case

  23. Planning Proving – Managing the Linux POC Project Initiation Project Definition • Value Proposition • Learning the value of System z Linux • Server Consolidation • Sizings • Business Case Development • POC Initiative • Scoping POC • POC IFL Sizings • Real memory sizing • Scope Document • Infrastructure Planning • Hardware • Software • Network • Security • Disk • Backup & Recovery • Project Planning • Scope Document • Project Plan • Team Roster • Systems Assurance • SOW Consulting Svc • Status Report • Phone Support • IBM Loaner Program • POR date • Success Criteria • Configs • Sizings • IBM Contracts • Linux Trial • Software Trial Installation & Set Up • IBM loaner Eq. • zVM & Linux install • Other SW install • Network • Security • Disk • DB loads • Application set up • Other Distributed Servers • Weekly Status Meeting • Status Report Testing • Test Plan • Unit • Volume/Performance • Weekly Status Mtg • Status Report • Issues Management • Escalation Process • Resource Management • In house • Mainline • IBM • Linux vendor • ISVs Closing • POC Final Report • Success Criteria Acceptance • IFL Purchased or removed • Production Implementation Planning • Purchasing • Technical Services • Vendor 24x7 Support

More Related