ETIS+ Conference, Brussels 27 May 2011 Paul van de Lande, TNO

RETRACK : Setting up an innovative rail freight service between North Sea and Black Sea WP 12: Knowledge Base. ETIS+ Conference, Brussels 27 May 2011 Paul van de Lande, TNO. Contents. Background and objectives RETRACK RETRACK project structure and activities WP 12: Knowledge Base

whitley
Download Presentation

ETIS+ Conference, Brussels 27 May 2011 Paul van de Lande, TNO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RETRACK: Setting up an innovative rail freight servicebetween North Sea and Black SeaWP 12: Knowledge Base ETIS+ Conference, Brussels 27 May 2011 Paul van de Lande, TNO

  2. Contents • Background and objectives RETRACK • RETRACK project structure and activities • WP 12: Knowledge Base • Work planning

  3. Policy background • Strong rail freight market crucial for socio-economic and environmental targets, within the EU and between the EU and surrounding countries • European transport policy based on level playing field and fair competition • Two decades of liberalisation in rail freight: • Emergence of new rail private operators • From marginal to major players • Incumbents fight back: mergers and acquisitions • Concrete actions to support this EU policy: develop and demonstrate new rail freight services with private operators on selected corridors

  4. Corridor development ERTMS Corridors planned TEN-T/ERTMS Corridors A-F

  5. RETRACK corridor analysis Rotterdam: Dry/liquid bulk Maritime containers Duisburg: All cargo Ludwigshafen: dry/liquid bulk Bratislava/Kosice: Steel/automotive Oradea, Constanta, All cargo Wels or Vienna: All cargo Budapest: All cargo Feeder point for Slovakia

  6. RETRACK project • FP6, Integrated Project, supported by DG MOVE • Objective: develop, demonstrate, and implement innovative and market-proven rail freight service along NW-SE corridor, by a group of private railway companies • Project duration: May 2007– August 2012 • Project Budget: app. 23 million euro • 13 Work Packages • 11 consortium partners: R&D/IT consultants: Rail operators/ Railway companies:

  7. RETRACK project structure

  8. First demonstration launched 27/02/10

  9. Demonstration status-quo Parties: TransPetrol: Rail operator Traction providerrs on main route: MWB: NL – Keulen – Passau LTE: Passau – Hegyeshalom CER: Hegyeshalom – Gyor : Gyor – xxx: ServTrans • Transported goods: • Automotives • Chemical, • Agri-bulk • Continental & maritime containers Rotterdam • Current challenges: • Extend service to RO • Infra. condition, charges in HU, RO. • High shunting costs • OSS not working yet Keulen Antwerp Passau Hegyeshalom Debrecen Orosháza Györ Hajduboszormeny • Train Characteristics: • 600 m in length • Up to 2.200 t (1800 ton) • Frequency: >3x/wk, more demand • Transit time: 21 hours (16 hours) Szabadegyhaza Constanta

  10. RETRACK corridor extension

  11. WP 12 Objectives • The RETRACK Knowledge Base shall contribute to: • Improve the quality of infrastructure modelling in the field of capacity and infrastructure management • Development of business models with integration of different transport modes and collaboration strategies • Establishment of a web-based platform for monitoring and development of trans-European rail freight corridors • Improvement of the rail freight market opening by providing transparent monitoring of market and framework conditions • Generic approach for various corridors in combination with ETIS+ leads to substantial information tool

  12. Knowledge Base elements • Web portal and contents management system • A public and a restricted document repository and search system • Table data: data viewer with tables, maps and charts and data editor • Geo data: network data viewer with infrastructure and topology • Survey system to define, conduct and visualise online surveys • Support data exchange with external systems as TENTec, Gisco, TRANSTOOLS, ETIS+

  13. Knowledge Base target group • EC Policy makers and agencies, amongst others: • DG Move • TEN – TEA • ERRAC • Rail freight Corridor managers • National policy makers • National infrastructure managers • Commercial rail operators • Branche organisations, a/o UIRR, UIC, Xrail, CER, ESC • Individual customers, 3PLP’s, shippers • Others, a/o R&D institutes, consultants, interest groups

  14. WP 12 Approach conform ETIS-BASE Top-down Bottom-up policy questions indicators data, information, knowledge

  15. Topics and questions

  16. Work planning • Start: January 2011 • Finalisation: August 2012 • Knowledge Base structure: June 2011 • Technical design: October 2011 • Data collection and data entry: September 2011 – July 2012

  17. Thank you for your attention! • Contacts • Paul van de Lande: paul.vandelande@tno.nl • Min Zhang: min.zhang@tno.nl • Mobility and Logistics • T: +31 88 866 8533 • F: +31 15 269 6854 • E: I: www.tno.nl