An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Appalachian State University Information Technology Infrastructure & Systems

  2. Network and Computing Infrastructure – what is it?

  3. Fiber Plant Capacity • Current fiber plant built in early 1990s • ~72 pair of Single Mode, long distance & high speed • 24 pair of Multimode, outdated, little value • Design connects Data Centers and Distribution buildings via redundant paths • Distribution buildings to others is single path • New 144 pair paths are being pulled to tie Raley to StateFarm DC

  4. Network Capacity • Wired Connections ~40000 ports • Wireless Connections • 98% of internal space is covered by wireless canopy • 1759 access points: 915 ResNet + 844 Admin & Academic • 7000 average users/day with peaks to 12,000 • 30% of our bandwidth with peaks to 60% • Registered Clients • 48,016 registered devices on the network • 24,494 student devices • 412 Servers providing services to the world (272 Central & 141 Distributed)

  5. Data Center Capacity • Primary Data Center – Raley Hall • ~2200 SqFt / Very near capacity • (8) Server racks - 272 rack units • (6) Storage racks – 252 rack units • (6) Network racks – 252 rack units • 360KW Back up generator • (3) 10 ton Air handler units • (3) UPS – 220Kw battery backup • Secondary Data Center – Anne Belk Hall • ~600 SqFt / Capacity exhausted • Bond growth taxed our Data Center capacities • More computers -> More power -> More cooling REPEAT

  6. Security Capacity • Firewalls: Internet edge and between Border and Core • VPN: Protect and provide remote access to protected services such as INB Banner and Ustor • Intrusion Detection: Monitor traffic signatures for threats to the network and/or clients • Virus Protection and Quarantine Process: Manage stability and integrity of network, infected devices removed from the network until cleaned and stabilized. Average deleting and cleaning >100 virus infections/month • Spam Filters: Filter >70% of the email that hits our servers

  7. Systems Capacity • ~132 Physical Servers • 13 of these provide virtualization service for 308 VMs • Operating Systems distribution • 256 Windows Servers • 141 Linux Servers • 30 SUN/Oracle Solaris

  8. Storage and Backup Capacity • Storage and Backup Services • Two storage architectures • Banner/Email – 27Tb total 17 Tb used • EMC Disk-based backup - 87% Data reduction thru compression and deduplication • Other Enterprise App. Storage and Departmental/User • 21.9 Tb total 16.3 Tb used (80% usable limit) • NetApp Disk-based backup – 65 Tb total 44.8 Tb used • Tape library – 219 tapes ~500 Tb of data

  9. How we got here. • 2000 – NC Infrastructure Bond. (2000-2007) • 4+ Million dollar infusion in to IT infrastructure and Capital Building projects. • One time money primarily earmarked for • IT Infrastructure • Building Infrastructure • Network Infrastructure • Security Infrastructure • Systems Infrastructure • Data Center Infrastructure • Capital Building Projects

  10. What we did with the money (cont.) • Building & Fiber Infrastructure upgrade • Built additional capacity into campus fiber plant • Upgraded building wiring to cat 5 specification • Network Upgrade • Forklift upgrade of all Network electronics • Core and Distribution routers – 1 GB connectivity • Edge switches - 10/100 MB port for every office • Expanded Wireless to near 100% campus coverage for convenience use

  11. What we did with the money (cont.) • Data Center Upgrades • Established 2nd Data Center in Belk • Began building High Availability services • New HVAC Units providing more cooling • New UPS units to power more equipment • New generator for Belk for backup power

  12. What we did with the money (cont.) • Security Upgrade • Implemented Intrusion Prevention • Implemented & Upgrade Firewalls • Systems Upgrade • Purchase Sun E2900 Server in 2003 for Banner • Upgrade to Email and Portal Infrastructure • Storage Area Network • Purchased Initial SAN storage in ~2003

  13. What have we done since then? 2000-2007: Tremendous growth, no refresh plan and realization of managing enterprise resources and data center capacity 2008: Banner and Email Storage to SAN ($525K), upgraded storage drives, split Banner out to SUN Storage. 2009: Upgraded NetApp controllers and added storage shelves 2010: Implemented Intrusion Detection technology

  14. What have we done since then? 2011: Replace Banner servers ($250K) 2012: Upgraded Core, Border, and Distribution routers to 10+ gig ~$1.2 mil (operational lease), Invested ~$400,000 in wireless infrastructure 2013: Rebuilt/upgraded campus edge/firewall hardware to 10Gig. ~$225k, Upgraded network bandwidth from 1 gig to unlimited - $155k/year, Upgrade IDS to accommodate 10 Gig 2013

  15. Addressing the Gap • End of life – Much of what we purchased in 2000-2007 has reached its vendor supported end-of-life. • Security & Feature Updates are no longer developed • Rely on 3rd party support for much of our Enterprise services

  16. Addressing the Gap • Network edge - Self Support maintenance model since 2010 • Next Gen Technology identified, refreshing as funds become available. • Security - Encryption, policy, data loss prevention, PCI, scanning tools • Several services/applications and their systems are showing age. Portal and Email technologies are 8+ years old. • Most storage on the SAN will reach EOL in 12-24 months. Consolidating storage strategies and developing the use of cloud storage will create efficiencies in management and budgeting • Evaluate our service catalog and refresh technologies where necessary

  17. Addressing the Gap • Proposed Data Center – State Farm Warehouse • ~3000 SqFt • Capacity will be initially 1.5 times Raley • Growth to ~3 times Raley • Will become Primary & potentially our only DC • Implements current technologies to optimize environmental efficiencies • Funded primarily through Energy Performance contracts

  18. Budget and Strategic Planning • Governance Portfolios to assess, manage and set strategy for technology services • Master plan for network and computing infrastructure investments • Fiber plant strategy consultation • Network and Telecom convergence model • Security program and strategy • Put vendors head to head on server solutions • Developing storage plan focusing on cloud

  19. Budget and Strategic Planning • Budget Sustainability • IT budget was originally divided between operation costs and growth(refresh) costs. • Bond and subsequent investments created imbalance – Maintenance consumes greatest percentage of operating budget • Need to work toward budget model that supports strategic investment AND refresh cycle