110 likes | 221 Views
Sector wise supply. Source-wise availability :. Expected domestic availability. Expected R-LNG availability. Estimated sector wise demand. Present pipeline. infrastructure in the country:. Additional pipeline after commissioning of new pipeline & up gradation of existing pipeline:.
E N D
Presentpipeline infrastructureinthecountry:
Additionalpipelineaftercommissioningofnew pipeline&upgradationofexistingpipeline:
PIPELINEINFRASTRUCTURE–EXISTING&Future NANGAL BHATINDA DELHI BAREILLY GURGAUN AURAIYALUCKNOW JAGDISHPUR DISPUR MATHANIAAGRA DAHEJI&II 10mmtpa* KANPUR PHOOLPUR PATNA GWALIOR KOTA UJJAIN AHMEDABAD JHANSI VIJAYPUR GAYA BOKARO VARANASI AGARTALA KOLKATA RAJKOT LNG HAZIRA 2.5mmtpa CUTTACK BHARUCH MUMBAI BARODA SURAT PUNE Existing Upcoming DAMRA BHUBANESHWAR KRISHNAPATNAM TransmissionPipelines ExistingPipeline PipelineauthorizedtoGAIL RAJAMUNDRY KAKINADA HYDERABAD VIJAYAWADA NELLORE BHOPAL SOLAPUR DABHOL 5mmtpa KOLHAPUR GOA ENNORE 2.5mmtpa BANGLORE PipelineauthorizedtoRGTIL HASAN MANGLORE CHENNAI CityGas/CNG TIRUCHCHIRAPALLI KANJIKKOD Existing COIMBTORE Planned LNGTerminal KOCHI 5mmtpa TUTICORIN 9