1 / 8

Tuesday 22.5.2012

Tuesday 22.5.2012. Tuesday. 6:30 injection beam after collimator problems sorted out 7:17 dump by interlock BPMs: pilot being excited by the injection cleaning  Switched off injection cleaning for the third injection for the next fill. 8:48 – 4: 24 stable beams fill# 2651

Download Presentation

Tuesday 22.5.2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tuesday 22.5.2012

  2. Tuesday • 6:30 injection beam after collimator problems sorted out • 7:17 dump by interlock BPMs: pilot being excited by theinjection cleaning  Switched off injection cleaning for the third injectionfor the next fill. • 8:48 – 4: 24 stable beams fill# 2651 • 5.8 1033 cm-2s-1peak Luminosity • 1.43 1011 average bunch intensity at injection – rather big variations • Delivered 205 pb-1average to Atlas and CMS in 19:35 hours

  3. 15:18 the B1 bunches #1, #2 and #4 all of a sudden experienced a sharp loss (collisions in IP8 only)

  4. Bunch intensities and losses after 15 h collisions

  5. Wednesday Morning • 4:24 beam dumped by operator • 6:00 re-injecting lengthened by issues with the SPS bunch length • 8:00 filling again

  6. Varia • The request for abort gap cleaning was changed from 5e9 to 1e10 for beam 1 only. • BSRT and especially the AGM: closing of application should not affect operation • Take Soft Start data immediately after a beam dump at full energy when the MKIs are close to or above the MKI temperature interlock threshold • Take measurements (manual at the time being) head-tail monitor – investigate automatic triggering, possibly on BBQ amplitude • Vacuum will need an access to repair a pumping group in S45 (not urgent)

More Related