1 / 2

D. Organizational Chart of Proposed Team

U.S. Department of State IDIQ Contract. Project Architect Raymond Ferrari, AIA, LEED AP Matrix Settles. Project Manager Erik Tjossem Matrix Settles. Principal-In-Charge –Quality Control Steve Biegel, AIA, LEED AP Matrix Settles. Interior Designer Samantha Evans Skrab Matrix Settles.

Download Presentation

D. Organizational Chart of Proposed Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. U.S. Department of State IDIQ Contract Project Architect Raymond Ferrari, AIA, LEED AP Matrix Settles Project Manager Erik Tjossem Matrix Settles Principal-In-Charge –Quality Control Steve Biegel, AIA, LEED AP Matrix Settles Interior Designer Samantha Evans Skrab Matrix Settles Project Team Senior Civil Engineer Mahendra Shah, PE Martin O’Brien Johnson, PE, DPE Matt Larsen, PE, LEED AP Adtek Engineers Senior Structural Engineer Mahendra Shah, PE John Frankhouser, PE Cindy Ponafala, PE Adtek Engineers Senior Landscape Architect Donna Pivik, ASLA, Certified Arborist Adtek Engineers Mechanical Engineers Milton G. Iriarte, PE, LEED AP Brian D. Carroll, PE, LEED AP Frank Tierno, PE WSP Flack + Kurtz Plumbing /Fire Protection John Brokaw, CIPE Steven Mason, PE WSP Flack + Kurtz Electrical Engineers John A. Koroulakis, PE, LEED AP Frederick Holdorf, LC, LEED AP WSP Flack + Kurtz. Cost Estimating Scot McClintock, PE, CVS, FSAVE Robert Schnitzer - Electrical Glenn Fulton - Mechanical Faithful + Gould Acoustical Architect George Spano Polysonics Corp. Firmwide Resources D. Organizational Chart of Proposed Team CADD Technician Rami Cohen Matrix Settles

  2. National Archives and Records Administration Principal-In-Charge Steve Biegel, AIA, LEED AP Matrix Settles Project Manager Raymond Ferrari, AIA, LEED AP Matrix Settles QA / QC Gordon Spencer, AIA, RIBA Matrix Spencer, Inc. Project Architect Erik Tjossem Matrix Settles Project Team (Continued) Lighting Candace M. Kling Andrea Hartranft C.M. Kling & Associates, Inc. Acoustical Consultant George Spano Darshit Joshi Polysonics Corp. Elevator Consultant R. Graydon Ripley III Andrew M. Guest Vertran Enterprises, Ltd. Roofing/Waterproofing David J. DiQuollo, PE SEAL Engineering, Inc. A/S/C Cost Estimator James C. Akers Construction Cost Systems, Inc. Mechanical Cost Estimator Richard Driber Construction Cost Systems, Inc. Electrical Cost Estimator James Rogers Construction Cost Systems, Inc. Landscape Architect Elliot Rhodeside, FASLA Mark Mastalerz Rhodeside & Harwell LEED Sustainable Design B. Lee Harrelson, PE, LEED AP TM/R Engineering Commissioning Thomas M. Rohrbaugh, PE, NCEES TM/R Engineering Firmwide Resources D. Organizational Chart of Proposed Team (Continued)

More Related