An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monterrey Build Up Project

  2. Monterrey Build Up ProjectWS4209220 e-Sourcing Event • Initial Quotes & Value Engineering: • Initial Quotes at $5,987K (w/VAT) • Spent the week of 11/3 meeting with the GC’s on cost reduction ideas • Value Engineering lead to $1,112K in Savings eSourcingBid Summary: - 8 Participants / 44 Bids Placed Leading Bid:  $4.387K (After15% VAT) - eSourcing lead to $431K in Savings

  3. Monterrey Build Up ProjectGeneral Constructors Short List Short List – 3 GC’s separated by 1.3%

  4. Monterrey Build Up ProjectGC Selection • EGA’s Recommendations based on: • - Face to face meetings held last week • Previous experience working with the GC’s • GC’s exposure in the Monterrey marked Team Recommendation

  5. Monterrey Build Up ProjectValue Engineering not finished Potential Additional Savings of $200-$300K: Plan is to lock in the supplier for the final savings ideas and then sign the contract Team has reduce building costs by $1.8M from initial quotes

  6. Monterrey Build Up - Next Steps • Dec 1st Monterrey team meeting with the preferred GC and reviewing cost reductions & Timing • Dec 2nd “Redlined” contract being reviewed with Corporate Curt Stanton • Dec 7th Review contract with Mexican Legal • Dec 15th Gov environmental approvals should be complete • Dec 17st Sign Contract – Kick off GC • April 30th Build up complete (18 wks)