1 / 2

Trust But Verify 7110.65

Trust But Verify 7110.65. Current Wording

wiley
Download Presentation

Trust But Verify 7110.65

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trust But Verify 7110.65 Current Wording (Trust & Verify) EDCT times are revised for changing conditions en route or at affected airport (s). Terminal controllers use of aircraft reported EDCT for departure sequencing should be verified with the ATCSCC or overlying TMU prior to, or after departure.

  2. Trust & Verify Proposed Change (Trust & Verify) EDCT Times are revised by Air Carriers and Traffic Management for changing conditions en route or at affected airport (s). Terminal Controllers use of aircraft reported EDCT for departure sequencing should be verified with the ATCSCC or overlying TMU prior to departure if this can be accomplished without the aircraft incurring delay beyond the EDCT time reported by the aircraft. If the EDCT cannot be verified without incurring additional delay, the aircraft should be released based on the pilot reported EDCT. This time should be verified with the ATCSCC or overlying TMU after departure. If a discrepancy is discovered, it shall be passed to the ATCSCC for follow-up.

More Related