New England Single Source Contingency. Peter Brandien, Vice President System Operations NEPOOL Reliability Committee August 25, 2010. Overview.
E N D
New England Single Source Contingency Peter Brandien, Vice President System Operations NEPOOL Reliability Committee August 25, 2010
Overview One of the action items from the July 20 RC Meeting was to provide an analysis of the HQ Phase II limit for the summer months of June-Sept 2007-2009 similar to what was done for the NY-NE Interface These limits are posted to the ISO-NE website: http://www.iso-ne.com/trans/ops/limits/ssc/ssc.do The following table provides the information requested