1 / 3

New England Single Source Contingency

New England Single Source Contingency. Peter Brandien, Vice President System Operations NEPOOL Reliability Committee August 25, 2010. Overview.

willa-mack
Download Presentation

New England Single Source Contingency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New England Single Source Contingency Peter Brandien, Vice President System Operations NEPOOL Reliability Committee August 25, 2010

  2. Overview One of the action items from the July 20 RC Meeting was to provide an analysis of the HQ Phase II limit for the summer months of June-Sept 2007-2009 similar to what was done for the NY-NE Interface These limits are posted to the ISO-NE website: http://www.iso-ne.com/trans/ops/limits/ssc/ssc.do The following table provides the information requested

  3. Real Time HQ Phase II Transfer Capability (MW)

More Related