1 / 8

Design for Six Sigma An Introduction to Design and Development

Design for Six Sigma An Introduction to Design and Development. Course Content. Introduction What is Six Sigma? What is Design for Six Sigma (DfSS)? Benefits of DfSS DMADV Tools Deployment Structure Summary References. Translate into CTQ’s. Customer Voice: “Fast Service!”.

Download Presentation

Design for Six Sigma An Introduction to Design and Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design for Six Sigma • An Introduction to Design and Development

  2. Course Content • Introduction • What is Six Sigma? • What is Design for Six Sigma (DfSS)? • Benefits of DfSS • DMADV • Tools • Deployment Structure • Summary • References

  3. Translate into CTQ’s Customer Voice: “Fast Service!” CTQ: Cycle Time How to Measure: Time Client Requests To The Time Client Receives Service Target/Limits: Goal of 3 days, with max upper limit of 5 days

  4. Measurement System Analysis • Example: CTQ = Cell Phone Luminance • Ex: Take 2 technicians, using same photometer, measure 4 cell phones (3 times each) • Study will: • compare technicians to each other • Measure repeatability within each technician • Determine if overall measurement variation is acceptable for this process and spec limits

  5. Roof of Correlation NEGATIVE CORRELATION! “More Functions” is good, but it will reduce “Battery Life” How to resolve this contradiction? TRIZ! ROOF TechnicalRequirements CustomerRequirements INTERRELATIONSHIPS PlanningMatrix ProductTargets

  6. DOE Example Send postcards during week, letters on weekend Personalize the letter, not the postcard INTERACTION PLOTS DOE IS BEST TOOL TO TEST FOR INTERACTIONS!

  7. Helps identify shifts and trends Machine Wear Problem

  8. Additional Resources Quality Management Systems Solutionshttp://www.qmss.biz

More Related