LEAN IN THEORY AND PRACTICE

LEAN IN THEORY AND PRACTICE. LEAN - IN THEORY & PRACTICE. Technology Center Strategy Which LEAN- tools do we use ? 5 S SMED Kaizen So w hat is new? Control room Samples / Reprocentret Flexowash - C LEAN INKING Pass -Werk X- rite. STRATEGY. STRATEGY: PART 1 OF 3.

willow
Download Presentation

LEAN IN THEORY AND PRACTICE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LEAN IN THEORY AND PRACTICE

  2. LEAN - IN THEORY & PRACTICE • Technology Center Strategy • Which LEAN-tools do weuse? • 5 S • SMED • Kaizen • So whatis new? • Control room • Samples / Reprocentret • Flexowash - CLEANINKING • Pass-Werk • X-rite

  3. STRATEGY

  4. STRATEGY: PART 1 OF 3 EQUIP OUR SALES FORCE WITH THE RIGHT SALES TOOLS

  5. ONLINE TRAINING STRATEGY: PART 1 OF 3 +

  6. STRATEGY: PART 2 OF 3 HORIZONTAL INTEGRATION

  7. STRATEGY: PART 3 OF 3 BRING MORE CUSTOMERS INTO THE TECHNOLOGY CENTER WORLD CLASS DEMO’s

  8. LEAN TOOLS

  9. LEAN tools: 5 S Sorting Straightening out (or Set-in-Order) Sweeping (or Shining) Standardising Sustaining (or self-discipline)

  10. LEAN TOOLS: 5 S

  11. LEAN tools: smed Change-Over Optimisation orSMEDSingle Minute Exchange of Die

  12. Machine running Change-over Internal External External Machine running Machine stop Total change-over time LEAN TOOLS: SMED External Activitiesthatcanbeperformedwhile the machine is running Internal Activitiesthatcanbeperformedonlywhile the machine is stopped Therefore, as the internalactivitiesarecausing downtime, they have to bereduced and made more efficient

  13. Change-over time Total time Step 1 Define internal/external Step 2 Move external Step 3 Reduce internal Step 4 Step 5 Reduce external Step 6 Standardise Investment LEAN TOOLS: SMED • Remember • SMED is • 70% attitude • 20% training • 10% technique

  14. LEAN TOOLS: SMED

  15. LEAN TOOLS: KAIZEN

  16. WHAT IS NEW?

  17. Control room Samples Example of SMED analysis Kaizenchart Nilpeter Press Quality Certificate Print test with pre-presscompany to highlight/discuss print qualityissues

  18. joint Indirect sales & marketing activitIes Develop labels designed with the aim of demonstrating the full capability of Nilpeter’s technology Joint indirect sales & marketing activities with co-suppliers Reprocentret Raflatac Flint Zeller-Gmellin Kurz Stork … and many more A part of being “… your printing partner”for our customers

  19. JOINT INDIRECT SALES & MARKETING ACTIVITIES • Indirect joint sales & marketing activitIes

  20. THE BOX

  21. THE BOX IS FULL OF FOLDERS

  22. THE FOLDERS ARE FULL OF LABELS

  23. THE LABELS ARE FOR GIVE-AWAYS AND TO STAY IN THE BOX

  24. FLEXOWASH: CLEANINKING

  25. PASS-WERK

  26. X-RITE

  27. FUTURE ACTIVITIES IN THE PIPELINE • Incorporate the above in standard print demonstrations • Finalise 5S project • LEAN setupfor screen • LEAN setupfor FP-4 • FA 4* trolleys POSSIBLE FUTURE • Segment-orientatedOpen Houses • Inspectionequipmentcombined with productivitymonitoring system (eg. CERM) • Ideas from you

  28. THANK YOU FOR YOUR ATTENTION!