1 / 14

Noise Compatibility 1 st Quarter 2011 June 1, 2011

Noise Compatibility 1 st Quarter 2011 June 1, 2011. Aircraft Operations. Cleveland 1 st Qtr. Operations 2006 - 2011. There were 44,876 landings and takeoffs in the 1 st qtr. 2011; this is 1.38% below the 1 st qtr. 2010. Source: FAA Control Tower Traffic Count Reports.

willow
Download Presentation

Noise Compatibility 1 st Quarter 2011 June 1, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Noise Compatibility 1st Quarter 2011 June 1, 2011

  2. Aircraft Operations Cleveland 1st Qtr. Operations 2006 - 2011 There were 44,876 landings and takeoffs in the 1st qtr. 2011; this is1.38% below the 1st qtr. 2010. Source: FAA Control Tower Traffic Count Reports

  3. Fleet Mix : 1st Qtr, 2011 vs. 1st Qtr, 2010 Landings & Takeoffs 1st Qtr, 2011 1st Qtr, 2010

  4. Runway Use: 1st Qtr, 2011 Landings 41.9% 24R 9.2% 24L 0.76% 10 11.1% 28 32.5% 6L 4.5% 6R

  5. Runway Use: 1st Qtr, 2011 Take-Offs 15.8% 06L 21.0% 06R 0.52% 28 0.08% 10 19.1% 24R 43.6% 24L

  6. Aircraft Noise • 1 57.0 12 54.6 2 • 11 60.6 48.9 • 4 56.0 5 61.7 10 6 50.1 7 N/A 62.1 9 1st Qtr, 2011 DNL by Noise Monitoring Site 53.5 8 52.9 Due to malfunctions at NMS09 in Feb and Mar, the quarterly DNL at NMS09 was estimated from daily Jan DNLs and the runway use patterns over the remainder of the quarter. NMS06 was disconnected from power, dismantled and placed in storage in November 2008 due to runway expansion.

  7. DNL: 1st Qtr, 2011 vs. 1st Qtr, 2010 65 DNL federal noise compatibility threshold of significance Due to malfunctions at NMS09 in Feb and Mar, the 1st Qtr, 2011 DNL at that site was estimated from daily Jan DNLs and runway use patterns for the remainder of the quarter.

  8. Five Qtr DNL Comparison 65 DNL federal noise compatibility threshold of significance NMS09 data was available Jan 2-24, but not most of Feb, nor any of Mar. DNL at NMS09 was estimated over all days from daily operations per runway, especially those by louder hush-kitted aircraft. These numbers were used to calculate the DNL at NMS09 for this quarter as a whole. This quarter, data was available every day at the remaining nine sites.

  9. Distribution of Noise Events

  10. Top 3 Lmaxs at each NMS, 1st Qtr,(1 of 2) Sound Exposure Level is a measure that takes into account all noise over the entire duration of an event.

  11. Top 3 Lmaxs at each NMS, 1st Qtr,(2 of 2) Sound Exposure Level is a measure that takes into account all noise over the entire duration of an event.

  12. Noise Hotline (216.898.5220)

  13. Complaint Location Map: 1st Qtr, 2011 LEGEND Complaints per household 1 complaint 2 to 5 complaints 6 or more Noise Monitoring Station

More Related