An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Planning AND Control BMFP 4513 Transportation Models

  2. Outline • Transportation Modeling • Developing An Initial Solution • The Northwest-Corner Rule

  3. Learning Objectives When you complete this module, you should be able to: Identify or Define: • Transportation modeling

  4. Learning Objectives When you complete this module, you should be able to: Explain or Be Able to Use: • Northwest-corner rule

  5. Transportation Modeling • An interactive procedure that finds the least costly means of moving products from a series of sources to a series of destinations • Can be used to help resolve distribution and location decisions

  6. Transportation Modeling • A special class of linear programming • Need to know • The origin points and the capacity or supply per period at each • The destination points and the demand per period at each • The cost of shipping one unit from each origin to each destination

  7. Transportation Problem Table C.1

  8. Boston (200 units required) Cleveland (200 units required) Des Moines (100 units capacity) Albuquerque (300 units required) Evansville (300 units capacity) Fort Lauderdale (300 units capacity) Transportation Problem Figure C.1

  9. Des Moines capacity constraint Factory capacity To Albuquerque Boston Cleveland From $5 $4 $3 100 Des Moines Cell representing a possible source-to-destination shipping assignment (Evansville to Cleveland) $8 $4 $3 300 Evansville $9 $7 $5 300 Fort Lauderdale Warehouse requirement 300 200 200 700 Cost of shipping 1 unit from Fort Lauderdale factory to Boston warehouse Clevelandwarehouse demand Total demand and total supply Transportation Matrix Figure C.2

  10. Northwest-Corner Rule • Start in the upper left-hand cell (or northwest corner) of the table and allocate units to shipping routes as follows: • Exhaust the supply (factory capacity) of each row before moving down to the next row • Exhaust the (warehouse) requirements of each column before moving to the next column • Check to ensure that all supplies and demands are met

  11. Northwest-Corner Rule Assign 100 tubs from Des Moines to Albuquerque (exhausting Des Moines’s supply) Assign 200 tubs from Evansville to Albuquerque (exhausting Albuquerque’s demand) Assign 100 tubs from Evansville to Boston (exhausting Evansville’s supply) Assign 100 tubs from Fort Lauderdale to Boston (exhausting Boston’s demand) Assign 200 tubs from Fort Lauderdale to Cleveland (exhausting Cleveland’s demand and Fort Lauderdale’s supply)

  12. To (A) Albuquerque (B) Boston (C) Cleveland Factory capacity From $5 $4 $3 100 100 (D) Des Moines $8 $4 $3 200 100 300 (E) Evansville $9 $7 $5 100 200 300 (F) Fort Lauderdale Warehouse requirement 300 200 200 700 Means that the firm is shipping 100 bathtubs from Fort Lauderdale to Boston Northwest-Corner Rule Figure C.3

  13. Route From To Tubs Shipped Cost per Unit Total Cost D A 100 $5 $ 500 E A 200 8 1,600 E B 100 4 400 F B 100 7 700 F C 200 5 $1,000 Total: $4,200 Northwest-Corner Rule Computed Shipping Cost This is a feasible solution but not necessarily the lowest cost alternative Table C.2