110 likes | 245 Views
Rhode Island School of Design (RISD) Mercury Release Response 14-19 May 2006. RISD Mercury Release May 2006 Release Location Map. RISD Mercury Release May 2006. RISD Mercury Release May 2006 Building Layout. Fletcher: Student Studios. Mason: Offices, Class- Rooms, Work-spaces.
E N D
Rhode Island School of Design (RISD)Mercury Release Response14-19 May 2006
RISD Mercury Release May 2006Building Layout Fletcher: Student Studios Mason: Offices, Class- Rooms, Work-spaces
RISD Mercury Release May 2006Release Location • Release on Fletcher 2nd floor landing • Fletcher & Mason are joined, common HVAC • Mercury tracked throughout • Approx .25-.5 lb – “golf ball” size
RISD Mercury Release May 2006Mercury Response Issues • Hg contamination spread • Need for sufficient instrument assets ASAP • Need for external high capacity HVAC • Public information • What is re-occupancy level & who sets (DOH) • Hopcalite test radius of influence and need vs rigorous monitoring w/ multiple Lumex’s • Unified command with State & Local agencies and Public Health Officials key
RISD Mercury Release May 2006Hg Concentrations of Interest-all in ng/m3 • IDLH 10,000,000 • OSHA PEL 100,000 • NIOSH REL 50,000 • ACGIH TLV 25,000 • ATSDR proposed action level 10,000 • ATSDR proposed re-occupancy level 1,000 • USEPA RfC (chronic) 300 • ATSDR minimal risk level (chronic) 200 Jerome range: 3000-999,000 Lumex range: 2-2000