Roadmap towards the MYRRHA Accelerator Construction. Luis Medeiros Romão Dirk Vandeplassche SCK CEN. MYRRHA Accelerator 1 st International Design Review – Brussels, 12 – 13 November 2012. Agenda. Context Scope Time frame Reactor’s roadmap General needs R&D Roadmap
E N D
Roadmap towards theMYRRHA Accelerator Construction Luis Medeiros Romão Dirk Vandeplassche SCKCEN MYRRHA Accelerator 1st International Design Review – Brussels, 12 – 13 November 2012 Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Agenda Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 • Context • Scope • Time frame • Reactor’s roadmap • General needs • R&D Roadmap • Road to construction • Concluding thoughts
Context Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 • SCKCEN: • promoting ADS • but…without accelerator tradition • and…in a nuclear reactor environment • Belgium: • supporting ADS • without accelerator development tradition in the research environment
Scope, in a nutshell Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 • Superconducting Proton Linac (coupled to sub-critical reactor): • 600MeV • 4mA • CW • MTBF > 250h • Full power beam-dump (2.4MW) • ISOL@MYRRHA beam deviation system (optional)
What do wewant to build ? Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
InjectorsBuilding Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Linac Tunnel & RF Gallery Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
HEBT Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Ancillary & Distributed Systems Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
MYRRHA’s Time Line 2019 On site assembly 2020-2022 Commissioning 2016-2018 Construction of components & civil engineering 2010-2014 - R&D - Front End Engineering Design 2015 Tendering & Procurement 2023 Progressive start-up 2024- Full exploitation PDP preliminary dismantling plan PSAR preliminary safety assesment EIAR environmental impact assesment FEED (Front End Engineering Design) Owner Consortium Group Central Project Team Owner Engineering Team Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
MYRRHA in 2024 Accelerator (600 MeV - 4 mA proton) Reactor • Subcritical or Critical modes • 65 to 100 MWth Spallation Source Multipurpose Flexible Irradiation Facility Fast Neutron Source Lead-Bismuth coolant Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Reactor’s roadmap Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Reactor’s roadmap Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Accelerator Postulate Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 The accelerator is a unique engine with first of a kind performances that can be acquired by the MYRRHA Consortium from an external scientific – industrial collaboration, the Accelerator Consortium.
General Needs Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Present Accelerator Roadmap Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
R&D Roadmap Cryomodule prototypes RFQ@UCL Phase 1 • engineering • construction • test today end 2014 MAX FP7 SC-CH spoke elliptic end 2016 Prod INJ@UCL Phase 2 RT-CH elliptic INJ@UCL Phase 3 SC-CH Prod end 2018 RAFI FP8 Prod 17 Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
2014 Recruitement plan Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Road to construction Building layout RF gallery Ventilation Cooling Accelerator Electricity today 2015 Cryogenics 2017 Global Integration Integration Integration 2019 Manufacturing and Installation 2020 Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Present Accelerator Scenario Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012
Concluding thoughts Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 • MLA can be considered as an engine • 2 choices: Make or Buy • SCK’s present position: Buy is the choice really open ? • Is this model viable ? • Other similar projects follow a different path • Strong internal involvement in every phase • European project is in preparation in order to analyse this scenario
Concluding thoughts Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 • Longer term issues: • Operations • Maintenance • Reengineering • Configuration management Can the MYRRHA Consortium live without the Accelerator Consortium after delivery ?