380 likes | 394 Views
This conference focuses on developing, maintaining, and improving facilities in Texas higher education institutions to promote student success and excellence through efficient planning systems. Discussions include statutory requirements, campus planning responsibilities, master plans, deferred maintenance, replacement value, room utilization, and facilities inventory systems. The aim is to enhance campus environments, support academic missions, and utilize resources effectively. Join us to learn about key strategies for upgrading infrastructure, ensuring sustainability, and meeting the demands of educational excellence in the coming years.
E N D
Closing the Gaps: Facilities Development and Planning Systems Texas Higher Education Coordinating Board February 26, 2004
Organization TAIR Conference
Closing the Gaps by 2015 • Participation • Add 500,000 more students • Success • Increase by 50% the number of identifiable student successes from high quality programs TAIR Conference
Closing the Gaps by 2015, cont. • Excellence • Increase the number of nationally recognized programs or services • Research • Increase the level of federal science and engineering research funding by 50% to $1.3 billion TAIR Conference
Closing the Gaps by 2015, cont. • We must be good stewards of the state’s - and the student’s – resources • Develop and maintain facilities that: • Promote the campus mission of instruction, research and service • Are attractive to students, faculty, and the community • Operate in an efficient and effective manner TAIR Conference
Statutory Requirements • Chapter 61 of the Education Code • Formulas for Space Utilization • Facilities Standards • Facilities Planning • Project Approvals • New Construction • Repair and Renovation • Property • Audit of Facilities TAIR Conference
Campus Planning Responsibilities • Review and evaluate project applications • Support the Committee on Campus Planning and the Board • Develop and maintain Board rules related to facilities • Shared oversight of Office of Civil Rights Priority Plan regarding Texas Southern University and Prairie View A&M University TAIR Conference
Campus Planning Responsibilities, cont. • Review, evaluate, and report • Master Plans (MP1) • Deferred Maintenance (MP 2-3-4) • Classroom and Class Lab Utilization • Facilities Inventory System • Space Projection Model • Higher Education Assistance Fund (HEAF) • Tuition Revenue Bond Projects TAIR Conference
Master Plans • MP 1 • Planned construction, renovation, information resources, and land acquisitions planned for the next 5 years • MP 2-3 • Deferred maintenance needs and a schedule to address them • MP 4 • Actual expenditures on accumulated deferred maintenance for the previous fiscal year TAIR Conference
Master Plans, cont. TAIR Conference
MP 1 • Consolidated with the Bond Review Board’s Capital Expenditure Plan • Presented to the Committee on Campus Planning in September • Projects submitted for approval must be included on the MP1 unless the institutions could not “reasonably have foreseen the project need” TAIR Conference
MP 2-3: Deferred Maintenance • Accumulated deferred maintenance • projects from prior years • not included in the maintenance program • priority status was perceived to be lower than those funded within the budget • Critical deferred maintenance • place facilities, occupants, or mission at risk TAIR Conference
Replacement Value • Question: How much would it cost to replace an institution’s E&G space? • Methodology considers a building’s FUNCTION rather than its actual construction cost • Calculated annually • Uses facilities inventory • Uses historical construction costs • Used to determine deferred maintenance to replacement value ratio TAIR Conference
DM/RV Ratio • This ratio only includes reported deferred maintenance on E&G facilities • Used to evaluate project applications • Coordinating Board standard: DM/RV < 5% Deferred Maintenance Replacement Value TAIR Conference
Room Utilization • Not calculated for health-related institutions • Calculated for classrooms (RT 110) and class laboratories (RT 210) • Utilization = Duration ÷ Number of rooms • Duration is the number of 50-minute hours of scheduled class time, as reported in an institution’s certified CBM 005 report • Room counts are pulled from the facilities inventory RT = Room Type TAIR Conference
Room Utilization, cont. • Coordinating Board standards • 38 hours per week for classrooms • 25 hours per week for class laboratories TAIR Conference
Facilities Inventory System • Updated and maintained by the institutions • Used to predict space need, calculate utilization, and evaluate projects • Currently updating systems to move from mainframe to server • easier to maintain • on-line updates TAIR Conference
Building Inventory • Data Elements • Three General Areas for Data Collection • Identification • Building Codes • Building Size and Cost Data TAIR Conference
Part A - Building Inventory TAIR Conference
Room Inventory • Data Elements • Four General Areas for Data Collection • Identification • Function Codes • The room inventory structure separates a specific Room Type, usage and program area. • Pro-rations of Use • A room can be reported with up to three use/program areas. • Room Type cannot be prorated. • Room Size TAIR Conference
Part B - Room Inventory TAIR Conference
Part C – CIP Report TAIR Conference
Part D – Campus-Wide Summary TAIR Conference
Part E – Space by Room Type TAIR Conference
Part F - Room Inventory TAIR Conference
Facilities Inventory System, cont. TAIR Conference
Project Application System • New Construction • Renovation • Auxiliary • Gifts, Purchase, or Real Estate • Lease of Real Property • Tuition Revenue Bonds TAIR Conference
Project Application System, cont. TAIR Conference
Project Application System, cont. TAIR Conference
Project Application System, cont. • Each institution has a FICE code and Password to enter the system • Only certain individuals have the password to submit the application • If you belong to a system, the system will usually review the application and submit it TAIR Conference
Process Overview TAIR Conference
Space Projection Model • Board Review • Consideration of proposals for facilities projects • Resource Allocation • Infrastructure Formula Funds • Higher Education Assistance Fund • Tuition Revenue Bonds Project Evaluations TAIR Conference
Space Projection Model, cont. • Five Factor Model • Predicts need for education and general space • Does not include auxiliary space TAIR Conference
Space Projection Model, cont. TAIR Conference
Evaluation of Projects • Submitted to Office of Campus Planning • Briefing Sheet prepared based on information in application • Evaluated against Board standards • Presented to Commissioner or Committee on Campus Planning • May be referred to Board TAIR Conference
Board Consideration • Board Standards • Merit of the Project • Staff Recommendations TAIR Conference
Project Tracking • Coordinating Board is required by statute to track project status • Institutions are required to report the status of an approved project to the CB on an annual basis • The Project Application System will be modified to incorporate project tracking • Project status will be collected until the project is included in the institution’s facilities inventory TAIR Conference
How to Contact Us CampusPlanning@thecb.state.tx.us http://www.thecb.state.tx.us/ CampusPlanning/ 512-427-6110 TAIR Conference