1 / 12

Identifying Capacity Gaps in M&E Developing Framework

Identifying Capacity Gaps in M&E Developing Framework. M&E Attribute 5 Institutionalization of M&E Systems in Rural Development Ministries 3 rd APCOP-MfRD Results-Based M&E Workshop Phnom Penh 28-30 June 2011. Contents. 1- M&E System 2- Program Structure

yoland
Download Presentation

Identifying Capacity Gaps in M&E Developing Framework

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Identifying Capacity Gaps in M&E Developing Framework M&E Attribute 5 Institutionalization of M&E Systems in Rural Development Ministries 3rd APCOP-MfRD Results-Based M&E Workshop Phnom Penh 28-30 June 2011

  2. Contents 1- M&E System 2- Program Structure 3- Planning and Budgeting Preparation 4- Monitoring & Evaluation Practices 5- Reporting System 6- Identifying Capacity Gaps

  3. 1- M&E System

  4. 2- Program Structure

  5. Program Structure (cont.) Source: M&E Manual

  6. 3- Planning & Budgeting Preparation  Planning Process

  7. 4- M&E Process

  8. 5- Reporting System M&E Process & Reporting:

  9. 6- Identifying Capacity Gaps in M&E System Institution Human Resource Development Budget

  10. Identifying Capacity Gaps (cont.) • Institution: • Harmonized M&E systems (Govt.&DPs) • Each entity’s M&E establishment is Different place (Role and function) • Organizational structure reform

  11. Identifying Capacity Gaps (cont.) • HRD: • Limited number of staff to carry out M&E • New promotion/nomination • Limited in receiving training

  12. Identifying Capacity Gaps (cont.) • Budget: • Limited budget to carry out M&E (Data and information collection, field observation/survey…)

More Related