1 / 14

LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011

LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011. LCLS-II Accelerator for 13.5 GeV, 120 Hz, 250 pC. 250 MeV  z  0.13 mm    1.1 %. 4.2 GeV  z  7 m m    0.43 %. 13.5 GeV  z  7 m m    0.01 %. 6 MeV  z  0.62 mm    0.05 %.

wirt
Download Presentation

LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011

  2. LCLS-IIAccelerator for 13.5 GeV, 120 Hz, 250 pC 250 MeV z  0.13 mm   1.1 % 4.2 GeV z  7 mm   0.43 % 13.5 GeV z  7 mm   0.01 % 6 MeV z  0.62 mm   0.05 % 135 MeV z  0.62 mm   0.07 % undulators L  120 m Linac-X’ L  0.6 m rf  -160 V0-19 MV 1-km bypass line Linac-0’ L  6 m 2-13 keV HXR rf gun L0-a,b Linac-3’ L  582 m rf  0° Linac-1’ L  9 m rf  -20° Linac-2’ L  326m rf  -32° SXR 14-7b 20-4d 11-3b 14-4d ...existing linac 0.24-2 keV LCLS-I 11-1 b,c,d X LCLS-I BC1’ L  6.5 m R56 -46mm BC2’ L  23 m R56 -29 mm DL1’ L 12 m R56  6.3 mm 0.5-10 keV SLAC linac tunnel BTH & U-Hall Jan. 12, 2011, 11:16 AM - PE

  3. LCLS-II Layout (After Linac) m LINAC END LCLS-I LTU1 muon plug wall LTU2 LTUH LTUS LCLS-II

  4. LCLS-II Layout (After Linac)

  5. LCLS-II Optics in Elegant (250 pC, 13.5 GeV) Bypass Line 2.4° bends BC1 BC2 HXR und. Thanks to Mark Woodley and Yuri Nosochkov

  6. What’s Included in the Elegant Tracking? • 2E5 macro particles(250pC) tracked through Parmela to 135 MeV. • 1st and 2nd-order optics (dipoles, quads, soln’s) and sinusoidal RF. • Longitudinalwakes of SLAC S-band RF structures. • Resistive longitudinal wakes of 1240 meters of 2-inch diameter stainless steel beam pipe (sector 20-5 to exit of muon-plug wall). • Resistivelongitudinal wakes of 330 meters of 1.625-inch diameter copper plated (?) LTU2 beam pipe. • CSR in all bends (1D model in Elegant) - includes transients but ignores transverse beam size (typically not a big impact). • ISR in all bends – small impact on slice E-spread and slice emittance. • Laser heateradds 17 keV rms E-spread at 135 MeV. • All components are error-free: perfect alignment & CSR-steering is removed.

  7. LCLS-II Particle Distributions (in Longitudinal Phase Space) 35 A Output from Parmela at 135 MeV Output from Elegant at 14 GeV 0.01% rms ~3 kA …with CSR

  8. CSR-Induced Emittance Growth Along BC2 (250 pC, 4.2 GeV) Includes double-horn distribution of LCLS 1.32 mm 1.09 mm gex gey 0.53 mm This calculation removes the linear correlations in x and x’ with energy in order to reveal only the irrecoverable CSR effect. The projected emittance after the BC2 without removing these linear correlation is 1.32 mm.

  9. CSR-Induced Slice Emittance Before and After BC2 (250 pC, 4.2 GeV) Includes double-horn distribution of LCLS Slice Emittance Before BC2 Slice Emittance After BC2

  10. CSR-Induced Emittance Growth Along LCLS-II Accelerator (13.5 GeV) Includes double-horn distribution of LCLS might be fixed? LTU2 2.4-deg Bends Vertical Bends Bypass Dog-Leg BC1 BC2

  11. CSR-Induced Emittance Growth Along LTU2 & LTUS (13.5 GeV) Includes double-horn distribution of LCLS pulsed bend 2.4° bends LTUS DL-bends Emittance across LTU2 bend system (horizontal in black and vertical in blue), including the 2.4-deg bends and the LTUS SXR branch line optics (8 dipoles total).

  12. Resistive-Wall Longitudinal Wakefield of 1240-m of 2-inch SS Pipe (Existing Bypass Line) Bane, Sands

  13. Resistive-Wall Longitudinal Wakefield of 1240-m of 2-inch SS Pipe (Existing Bypass Line) Before bypass linev After bypass line

  14. Final Slice Emittances (x & y) - with CSR - Before Undulator (250 pC, 13.5 GeV)

More Related