10 likes | 104 Views
Review Feb. 9 th 2004. Summary. OSGA/E6 9:00 Summary Talk MEG (T. Mori) 9:20 LXe beam test results (S. Mihara) 9:50 Calorimeter calibration, PMT tests and LXe cryostat (A. Baldini) 10:20 Coffee 10:40 LXe discussion (if requested) 10:40 Beam Line (P. Kettle)
E N D
Review Feb. 9th 2004 Summary OSGA/E6 9:00 Summary Talk MEG (T. Mori) 9:20 LXe beam test results (S. Mihara) 9:50 Calorimeter calibration, PMT tests and LXe cryostat (A. Baldini) 10:20 Coffee 10:40 LXe discussion (if requested) 10:40 Beam Line (P. Kettle) 11:10 COBRA Magnet (W. Ootani) 11:30 Drift Chamber (J. Egger) 12:00 Lunch Technical OSGA/E6 14:00 Overview of the new EDM project (O. Naviliat) 15:00 Coffee OSGA/E6 (MEG) 15:30 Timing Counter (F. Gatti) 16:00 Electronics (S. Ritt) 16:30 Software (C. Gatto) 17:00 Schedule (S. Ritt) OFLG/402 (EDM) 15:30 Collaboration structure etc. (K. Kirch) 15:50 Activities at ILL (D. Rebreyend) 16:10 Cs-magnetometry (S. Gröger / A. Weis) 16:30 The simulation group (G. Quemener) 16:50 UCN Detector (T. Lefort) 17:10 DLC coating (A. Pichlmaier) 17:30 External field stabilization (R. Henneck) 17:50 The DAQ for EDM (K. Bodek)