Middle Fork Project Potential Project Betterments October 1, 2007
Potential Project Betterments • PCWA’s evaluation of potential betterments has continued over last year • Three betterments will be included in the PAD • Hell Hole Reservoir Seasonal Storage Increase • French Meadows Powerhouse Capacity Upgrade • Ralston Powerhouse Capacity Upgrade
Betterments Analysis for Relicensing Flow Chart Initial data collection & screening - Conceptual design work PCWA inventory of potential betterments Betterments to carry forward in relicensing Project Description, June 2006 We are Here Include viable projects in License Application Engineering/environmental studies and agency/public consultation 2007-2010
Hell Hole Reservoir Seasonal Storage Increase • Purpose • Increase seasonal storage in Hell Hole Reservoir by 9,750 - 12,000 acre-feet.
Hell Hole Reservoir Seasonal Storage Increase • Hell Hole Dam Spillway Crest Gates • Hell Hole Dam Spillway Crest Gate Control Building and Powerline near Hell Hole Dam • Parapet walls at Hell Hole Dam, Hell Hole- Middle Fork Tunnel Gatehouse, and French Meadows Powerhouse • South Fork Long Canyon Diversion crest gates or check valve • Generator Building at SouthFork Long Canyon Diversion Dam Changes to Project Facilities
Hell Hole Reservoir Seasonal Storage Increase Operations • Wet Years with Spills • 9,750 -12,000 acre feet of additional water would be stored • Net generation increased • Inundation within the existing reservoir flood inundation zone – increase by approximately 37 acres
Hell Hole Reservoir Seasonal Storage Increase Operations • Non-spill years • 9,750 – 12,000 acre feet of additional storage could be used to defer early generation releases • Peaking generation increased • Reservoir inundation area temporarily increased by approximately 37 acres
Hell Hole Reservoir Seasonal Storage Increase Operations • Dry Years • Water not available for seasonal storage
French Meadows PowerhouseCapacity Upgrade • Purpose • Increase MFP peaking generation capability • Provide Ancillary Services to the energy market
French Meadows PowerhouseCapacity Upgrade Changes to Project Facilities • French Meadows-Hell Hole Tunnel Intake Trash Rack • Second generation unit and penstock at French Meadows Powerhouse • Tunnel Surge Capacity at French Meadows – Hell Hole Tunnel (Surge shaft/tank or surge pipeline) • Temporary upgrade of Forest Road 14N09A
French Meadows PowerhouseCapacity Upgrade Changes to Project Facilities (continued) • Project Road from Forest Road 14N09A to tunnel surge capacity facilities • Add transformers/switching equipment to the French Meadows Powerhouse Switchyard • Upgrade Transformers/Switching Equipment at Middle Fork Powerhouse Switchyards
French Meadows PowerhouseCapacity Upgrade Operations • All Water Year Types • Run one or both units • Increase transfer capability between French Meadows and Hell Hole reservoirs • Increase generation during peak energy demand period • Provide Ancillary Services while on standby or running at partial load
Ralston PowerhouseCapacity Upgrade • Purpose: • Increase powerhouse operating efficiency • Improve Synchronized Operations with Middle Fork Powerhouse
Ralston PowerhouseCapacity Upgrade Changes to Existing Project Facilities • Upgrade Ralston Powerhouse mechanical and electrical systems • All modifications within the existing powerhouse
Ralston PowerhouseCapacity Upgrade • Wet Years • Increase generation during peak energy demand periods • Dry Years • May increase generation during peak energy demand periods